Leads/fdot-resurfacing-sr5-us1-st-johns-co-st-johns-fl-a4162fe2
Completed · completeSt. Johns County

FDOT Resurfacing — SR5(US1) (St. Johns Co.)

SR5(US1) FROM MOULTRIE CREEK BRIDGE TO NORTHOF SR207, St. Johns County, FL

Load estimate pending
Lifecycle
Active as of Jul 1, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

FDOT Resurfacing — SR5(US1) (St. Johns Co.)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor
Hubbard Construction Company
📞 (407) 654-3201
Developer / Applicant

Not yet identified

The story

**FDOT SR5(US1) Resurfacing Project Summary:** This FDOT roadway resurfacing project in St. Johns County, FL is currently under construction on a ~10-mile stretch of US-1 from Moultrie Creek Bridge northward, representing significant hauling demand for asphalt millings, aggregate base, and debris removal through FY2025. The high hauling score (75/100) reflects active construction with material movement already underway—ideal for earthwork and recycled asphalt hauling providers. Contact Hubbard Construction Company (prime GC) at (407) 654-3201 to bid on material transport, waste removal, and soil handling services.

Why this is a hauling opportunity: FDOT resurfacing project, status: under construction, in St. Johns County, FY2025, — active construction, hauling in progress | FDOT public project (+15) | stage=under_construction, recent (+10) | government/public-authority project (floor 55) | FDOT public project (+15) | stage=under_construction, recent (+10) | government/public-authority project (floor 55) | FDOT public project (+15) | stage=under_construction, recent (+10) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-03-08FDOT_WORKPROGRAM
    Captured FDOTWP_21026945201 from fdot_workprogram
  2. 2026-03-08FDOT_WORKPROGRAM
    Captured FDOTWP_44752625201 from fdot_workprogram

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (transfer station)
THE OLD CITY TRANSFER STATION · Elkton
One-way
3.9 mi
Round trip
7.8 mi
Closest import source (quarry)
SRM Materials East Palatka · Murfresboro
One-way
15.8 mi
Round trip
31.5 mi
TypeNameCityOne-wayRT mi
quarrySRM Materials East PalatkaMurfresboro15.8 mi31.5
sand pitGrandin Sand PlantJacksonville36.7 mi73.3
sand pitKeuka Sand PlantJacksonville38.4 mi76.8
sand pitGoldhead Sand PlantJacksonville38.8 mi77.7
quarryEdgar Minerals, Inc.Davenport40.4 mi80.8
quarryDames Point TerminalBrooksville41.4 mi82.8
quarryThe Chemours Company FC LLCStarke45.5 mi90.9
transfer stationTHE OLD CITY TRANSFER STATIONElkton3.9 mi7.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Contractor
Hubbard Construction Company
49 active projects · Duval
📞 (407) 654-3201

Permits & Sources

Every connector that's seen this project

EARLY SIGNALFDOT Work Program(FDOT Work Program)

State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.

Official source-of-truth portal
St. Johns County Permits
Ponte Vedra / St. Augustine Building
ConnectorRecord IDCapturedLink
fdot_workprogramFDOTWP_210269452012026-03-08Open ↗
fdot_workprogramFDOTWP_447526252012026-03-08Open ↗

Parcel Detail

Property records and ownership

Property
County
St. Johns
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

Award

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/fdot-resurfacing-sr5-us1-st-johns-co-st-johns-fl-a4162fe2