FDOT Resurfacing — SR39 AT TRAPNELL ROAD (Hillsborough Co.)
SR39 AT TRAPNELL ROAD, Hillsborough County, FL
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
The FDOT Resurfacing project at SR39 and Trapnell Road in Hillsborough County, FL, involves critical roadway work that is currently underway and highlights significant hauling opportunities. This project matters for hauling providers due to the need for materials, earthwork, and potential demolition as part of the resurfacing efforts. Key contacts for this project include Watson Civil Construction, Inc. as the general contractor, and they can be reached at (904) 297-1800 for more information on hauling needs and opportunities.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_44539315201 from fdot_workprogram
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Four Corners | Lithia | 15.1 mi | 30.2 |
| quarry | Central State Aggregates LLC | Zephyrhill | 21.8 mi | 43.5 |
| quarry | South Pasture Mine | Lithia | 23.2 mi | 46.5 |
| quarry | Tampa Cement Grinding Plant | Tampa | 23.5 mi | 46.9 |
| quarry | South Fort Meade Mine | Lithia | 28.8 mi | 57.6 |
| quarry | Caloosa Materials | Ruskin | 29.6 mi | 59.1 |
| sand pit | Haines City Mine | Davenport | 30.4 mi | 60.9 |
| sand pit | Gator Sand Mine | Brooksville | 30.6 mi | 61.1 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_44539315201 | 2026-03-08 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Hillsborough
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-resurfacing-sr39-at-trapnell-road-hillsborough-co-hillsborough-fl-43d18394