FDOT Resurfacing — SR26(W UNIVERSITY AVE) (Alachua Co.)
SR26(W UNIVERSITY AVE) FROM GALE LEMERAND DRTO SR24(NE WALDO RD), Alachua County, FL
- Filed
- Permitted
- Active
- Completed
Paperwork in — not yet approved
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
**FDOT SR26 Resurfacing Project Summary** Anderson Columbia Co., Inc. is leading this FDOT resurfacing initiative on SR26 (W University Ave) in Alachua County, a roadway project spanning from Gale Lemerand Drive to SR24/NE Waldo Road with FY2027 funding—significant hauling demand for asphalt millings, reclaimed pavement, base materials, and debris removal. The project is currently in pre-construction/early stages (hauling score: 70/100), making it an ideal window to establish relationships with the prime GC before full mobilization. Contact Anderson Columbia at (386) 752-7585 to pitch hauling services for material transport and jobsite waste management.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-05FDOT_WORKPROGRAMCaptured FDOTWP_20781755201 from fdot_workprogram
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_43555825201 from fdot_workprogram
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | NEWBERRY LIMESTONE | Ocala | 10.8 mi | 21.5 |
| quarry | NEWBERRY MINE- LIMESTONE MATERIALS | Ocala | 11.8 mi | 23.5 |
| quarry | LIMESTONE PRODUCTS INCORPORATED | NEWBERRY | 12.2 mi | 24.4 |
| quarry | Newberry Cement Plant | Newberry | 13.7 mi | 27.4 |
| quarry | RALEIGH QUARRY | WILLISTON | 16.5 mi | 33.1 |
| quarry | Ocala Quarry | Atlanta | 20.6 mi | 41.3 |
| quarry | Levy County Pit | Bronson | 21.4 mi | 42.7 |
| quarry | Reddick Mine | Pompano Beach | 22.8 mi | 45.6 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_20781755201 | 2026-03-05 | Open ↗ |
| fdot_workprogram | FDOTWP_43555825201 | 2026-03-08 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Alachua
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-resurfacing-sr26-w-university-ave-alachua-co-fy2027-0c8d047b