FDOT Resurfacing — SR212(US90)BEACH BLVD (Duval Co.)
SR212(US90)BEACH BLVD FROM PARENTAL HOME RD TO ST. JOHNS BLUFF, Duval County, FL
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
# FDOT SR212/US90 Beach Boulevard Resurfacing (Duval County) This FDOT resurfacing project on Beach Boulevard from Parental Home Road to St. Johns Bluff involves significant roadway milling, asphalt removal, and base course work—creating immediate demand for demolition, haul-away, and recycled material transport. With contract executed and FY2025 funding active, the project is mobilizing soon and will require experienced hauling partners for debris removal and material staging. **Key contact: Hubbard Construction Company (prime GC) at (407) 654-3201.**
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_20954365201 from fdot_workprogram
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_20972435201 from fdot_workprogram
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Dames Point Terminal | Brooksville | 7.3 mi | 14.5 |
| quarry | The Chemours Company FC LLC | Starke | 38.9 mi | 77.7 |
| sand pit | Goldhead Sand Plant | Jacksonville | 40.1 mi | 80.1 |
| quarry | SRM Materials East Palatka | Murfresboro | 41.5 mi | 82.9 |
| sand pit | Grandin Sand Plant | Jacksonville | 44.2 mi | 88.5 |
| transfer station | WATER RECOVERY, LLC | Jacksonville | 5.1 mi | 10.3 |
| transfer station | REALCO RECYCLING CO., INC. MRF | Jacksonville | 9.1 mi | 18.2 |
| transfer station | COASTAL RECYCLING SERVICES | Jacksonville | 9.7 mi | 19.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_20954365201 | 2026-03-08 | Open ↗ |
| fdot_workprogram | FDOTWP_20972435201 | 2026-03-08 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Duval
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-resurfacing-sr212-us90-beach-blvd-duval-co-duval-fl-b7b24b29