FDOT — (US 441) FROM N OF SR 50 TO SR 414 INTERCHANGE RAMPS 44710415201 (*)
SR20(US441)N MLK MEM HWY FROM CR2054 TO NW 167TH BLVD, Alachua County, FL
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
The FDOT's US 441 roadway project in Alachua County, FL is currently under construction, focusing on improving infrastructure between SR 50 and the SR 414 interchange ramps. This project presents significant hauling opportunities for earthwork, materials, and potential demolition, essential for meeting the project's requirements. Key contacts include major general contractors such as American Design Engineering Construction Inc. (305-868-5717), Jr. Davis Construction Co., Inc. (407-870-0066), and C.W. Roberts Contracting, Inc. (813-756-2009).
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-05FDOT_WORKPROGRAMCaptured FDOTWP_20764875201 from fdot_workprogram
- 2026-03-23FDOT_LETTINGCaptured CO_T9042 from fdot_letting
- 2026-03-23FDOT_LETTINGCaptured CO_T5851 from fdot_letting
- 2026-03-23FDOT_LETTINGCaptured CO_T5852 from fdot_letting
- 2026-03-23FDOT_LETTINGCaptured CO_T2A30 from fdot_letting
- 2026-03-27FDOT_LETTINGCaptured CO_T5859 from fdot_letting
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | LIMESTONE PRODUCTS INCORPORATED | NEWBERRY | 9.2 mi | 18.3 |
| quarry | NEWBERRY LIMESTONE | Ocala | 9.5 mi | 19.1 |
| quarry | NEWBERRY MINE- LIMESTONE MATERIALS | Ocala | 10.2 mi | 20.4 |
| quarry | Newberry Cement Plant | Newberry | 12.2 mi | 24.4 |
| quarry | TOWNSEND PIT | Bell | 23.2 mi | 46.3 |
| quarry | Suwannee American Cement | Branford | 24.0 mi | 47.9 |
| quarry | SUWANNEE AMERICAN CEMENT | Branford | 24.0 mi | 47.9 |
| quarry | Levy County Pit | Bronson | 25.2 mi | 50.3 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_20764875201 | 2026-03-05 | Open ↗ |
| fdot_letting | CO_T9042 | 2026-03-23 | Open ↗ |
| fdot_letting | CO_T5851 | 2026-03-23 | Open ↗ |
| fdot_letting | CO_T5852 | 2026-03-23 | Open ↗ |
| fdot_letting | CO_T2A30 | 2026-03-23 | Open ↗ |
| fdot_letting | CO_T5859 | 2026-03-27 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Alachua
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-resurfacing-sr20-us441-n-mlk-mem-hwy-alachua-co-fy2026-999d5d00