Leads/fdot-resurfacing-sr15-us17-clay-co-fy2025-a3c28dd6
Active · utilitiesClay County

FDOT — (US 17 / N MAIN ST) FROM TROUT RIVER BRIDGE TO N OF...

SR15(US17) FROM WATER OAK LANE TO EAGLE HARBOR PARKWAY, Clay County, FL

Load estimate pending
Lifecycle
Active as of Jul 1, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

FDOT — (US 17 / N MAIN ST) FROM TROUT RIVER BRIDGE TO N OF...

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$14.3M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
4
Public records referencing this job
General Contractor
J.B. Coxwell Contracting, Inc.
📞 (904) 786-1120
Developer / Applicant

Not yet identified

The story

The FDOT roadway project on US 17/N Main St in Clay County, FL, involves critical infrastructure improvements and is currently under construction. This project represents significant hauling opportunities for providers, as it will require earthwork and materials transport, particularly for asphalt and concrete, given its high hauling score of 85/100. Key contacts for this project include J.B. Coxwell Contracting, Inc. (904-786-1120), Preferred Materials Inc. (813-973-2888), and Sun Civil LLC (813-694-7676), all prime general contractors managing various aspects of the site.

Why this is a hauling opportunity: FDOT awarded contract on (US 17 / N MAIN ST) FROM TROUT RIVER BRIDGE TO N OF... | FDOT public project (+15) | size signal: $14,300,000 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $14,300,000 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $14,300,000 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $14,300,000 valuation (+20) | stage=under_construction, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-03-05FDOT_WORKPROGRAM
    Captured FDOTWP_20820255201 from fdot_workprogram
  2. 2026-03-08FDOT_WORKPROGRAM
    Captured FDOTWP_44330215201 from fdot_workprogram
  3. 2026-03-23FDOT_LETTING
    Captured CO_T2A54 from fdot_letting
  4. 2026-03-23FDOT_LETTING
    Captured CO_T1914 from fdot_letting

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
CLAY COUNTY ROSEMARY HILL SWMF · Green Cove Springs
One-way
6.1 mi
Round trip
12.3 mi
Closest import source (quarry)
The Chemours Company FC LLC · Starke
One-way
19.2 mi
Round trip
38.4 mi
TypeNameCityOne-wayRT mi
quarryThe Chemours Company FC LLCStarke19.2 mi38.4
sand pitGoldhead Sand PlantJacksonville20.5 mi41
quarryDames Point TerminalBrooksville25.4 mi50.8
sand pitGrandin Sand PlantJacksonville25.7 mi51.4
quarrySRM Materials East PalatkaMurfresboro31.9 mi63.8
sand pitKeuka Sand PlantJacksonville32.9 mi65.8
quarryEdgar Minerals, Inc.Davenport34.8 mi69.6
landfillCLAY COUNTY ROSEMARY HILL SWMFGreen Cove Springs6.1 mi12.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Contractor
J.B. Coxwell Contracting, Inc.
11 active projects · Duval
📞 (904) 786-1120
Subcontractor
DUVAL ASPHALT PRODUCTS, INC.
Paving
13 active projects · Duval
📞 (904) 296-2020
People (2)
  • PAUL M JURGENSEN · CEO
  • KIMBERLY · AS ROWELL

Permits & Sources

Every connector that's seen this project

EARLY SIGNALFDOT Work Program(FDOT Work Program)

State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.

Official source-of-truth portal
Clay County Permits
Fleming Island / Orange Park Building
ConnectorRecord IDCapturedLink
fdot_workprogramFDOTWP_208202552012026-03-05Open ↗
fdot_workprogramFDOTWP_443302152012026-03-08Open ↗
fdot_lettingCO_T2A542026-03-23Open ↗
fdot_lettingCO_T19142026-03-23Open ↗

Parcel Detail

Property records and ownership

Property
County
Clay
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)