FDOT — (US 17 / N MAIN ST) FROM TROUT RIVER BRIDGE TO N OF...
SR15(US17) FROM WATER OAK LANE TO EAGLE HARBOR PARKWAY, Clay County, FL
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
The FDOT roadway project on US 17/N Main St in Clay County, FL, involves critical infrastructure improvements and is currently under construction. This project represents significant hauling opportunities for providers, as it will require earthwork and materials transport, particularly for asphalt and concrete, given its high hauling score of 85/100. Key contacts for this project include J.B. Coxwell Contracting, Inc. (904-786-1120), Preferred Materials Inc. (813-973-2888), and Sun Civil LLC (813-694-7676), all prime general contractors managing various aspects of the site.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-05FDOT_WORKPROGRAMCaptured FDOTWP_20820255201 from fdot_workprogram
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_44330215201 from fdot_workprogram
- 2026-03-23FDOT_LETTINGCaptured CO_T2A54 from fdot_letting
- 2026-03-23FDOT_LETTINGCaptured CO_T1914 from fdot_letting
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | The Chemours Company FC LLC | Starke | 19.2 mi | 38.4 |
| sand pit | Goldhead Sand Plant | Jacksonville | 20.5 mi | 41 |
| quarry | Dames Point Terminal | Brooksville | 25.4 mi | 50.8 |
| sand pit | Grandin Sand Plant | Jacksonville | 25.7 mi | 51.4 |
| quarry | SRM Materials East Palatka | Murfresboro | 31.9 mi | 63.8 |
| sand pit | Keuka Sand Plant | Jacksonville | 32.9 mi | 65.8 |
| quarry | Edgar Minerals, Inc. | Davenport | 34.8 mi | 69.6 |
| landfill | CLAY COUNTY ROSEMARY HILL SWMF | Green Cove Springs | 6.1 mi | 12.3 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_20820255201 | 2026-03-05 | Open ↗ |
| fdot_workprogram | FDOTWP_44330215201 | 2026-03-08 | Open ↗ |
| fdot_letting | CO_T2A54 | 2026-03-23 | Open ↗ |
| fdot_letting | CO_T1914 | 2026-03-23 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Clay
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-resurfacing-sr15-us17-clay-co-fy2025-a3c28dd6