Leads/fdot-resurfacing-sr121-baker-co-baker-fl-6102974a
Completed · completeBaker County

FDOT Resurfacing — SR121 (Baker Co.)

SR121 FROM I-10(SR8) TO GEORGIA STATE LINE, Baker County, FL

Load estimate pending
Lifecycle
Filed as of Jan 1, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

FDOT Resurfacing — SR121 (Baker Co.)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Preferred Materials Inc.
📞 (813) 973-2888
Developer / Applicant

Not yet identified

The story

The FDOT Resurfacing project on SR121 in Baker County, FL, involves significant roadway improvements aimed at enhancing travel safety and efficiency, currently in the review stage for FY2026. This project represents a critical hauling opportunity for providers specializing in materials and earthwork, as it includes substantial resurfacing operations that will require gravel, asphalt, and other materials. Key contacts for this project include Preferred Materials Inc., the general contractor, who can be reached at (813) 973-2888.

Why this is a hauling opportunity: FDOT resurfacing project, status: pre-const.underway, in Baker County, FY2026, — early stage, build relationships now | Connector base: 70 | FDOT/public project (+10) | Roadway/highway work (+10) | Keyword match: 1 categories (+5) | FDOT public project (+15) | government/public-authority project (floor 55) | FDOT public project (+15) | government/public-authority project (floor 55) | FDOT public project (+15) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-03-08FDOT_WORKPROGRAM
    Captured FDOTWP_44604235602 from fdot_workprogram

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
Cairo Landfill
One-way
30.6 mi
Round trip
61.2 mi
Closest import source (quarry)
Bainbridge Sand Mine
One-way
29.2 mi
Round trip
58.4 mi
TypeNameCityOne-wayRT mi
quarryBainbridge Sand Mine29.2 mi58.4
landfillCairo Landfill30.6 mi61.2
quarry(unnamed)30.8 mi61.6
quarry(unnamed)31.2 mi62.4
quarry(unnamed)31.3 mi62.6
landfillYoung Recycling & Dumpster Services33.5 mi66.9
quarryActive Minerals39.8 mi79.6
quarry(unnamed)40.7 mi81.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Contractor
Preferred Materials Inc.
Aggregate / Pit
109 active projects · Pinellas
📞 (813) 973-2888
People (8)
  • KENNETH C · VPAS LAING
  • ROBERT F · PD DUKE
  • WILLIAM B · VPAS MILLER
  • CHARLIE · ST BROWN
  • eben@eyebytes.com✉︎
  • GARY P · AS HICKMAN
  • +2 more

Permits & Sources

Every connector that's seen this project

EARLY SIGNALFDOT Work Program(FDOT Work Program)

State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.

Official source-of-truth portal
Baker County Permits
Macclenny Building Department
ConnectorRecord IDCapturedLink
fdot_workprogramFDOTWP_446042356022026-03-08Open ↗

Parcel Detail

Property records and ownership

Property
County
Baker
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

Award

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/fdot-resurfacing-sr121-baker-co-baker-fl-6102974a