Leads/fdot-resurfacing-sr10-duval-co-duval-fl-a2b1d0e5
Active · punchlistDuval County

FDOT Resurfacing — SR10 (Duval Co.)

SR10 FROM KERNAN OVERPASS TO MAYPORT ROAD, Duval County, FL

Load estimate pending
Lifecycle
Active as of Jul 1, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

FDOT Resurfacing — SR10 (Duval Co.)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Hubbard Construction Company
📞 (407) 654-3201
Developer / Applicant

Not yet identified

The story

The FDOT Resurfacing project on SR10 in Duval County, FL, involves crucial roadway improvements and is currently under construction. This project presents significant hauling opportunities for providers due to the need for earthwork and material transportation during the active construction phase. Key contact for this project is Hubbard Construction Company, led by the prime General Contractor, who can be reached at (407) 654-3201.

Why this is a hauling opportunity: FDOT resurfacing project, status: under construction, in Duval County, FY2026, — active construction, hauling in progress | Connector base: 75 | FDOT/public project (+10) | Roadway/highway work (+10) | Keyword match: 1 categories (+5) | Stage = under_construction — actionable now (+10) | FDOT public project (+15) | stage=under_construction, recent (+10) | government/public-authority project (floor 55) | FDOT public project (+15) | stage=under_construction, recent (+10) | government/public-authority project (floor 55) | FDOT public project (+15) | stage=under_construction, recent (+10) | government/public-authority project (floor 55) | FDOT public project (+15) | stage=under_construction, recent (+10) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-03-08FDOT_WORKPROGRAM
    Captured FDOTWP_44543015201 from fdot_workprogram

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (transfer station)
MAYPORT SOLID WASTE TRANSFER STATION · Jacksonville
One-way
3.8 mi
Round trip
7.6 mi
Closest import source (quarry)
Dames Point Terminal · Brooksville
One-way
9.5 mi
Round trip
19 mi
TypeNameCityOne-wayRT mi
quarryDames Point TerminalBrooksville9.5 mi19
quarrySRM Materials East PalatkaMurfresboro45.8 mi91.7
quarryThe Chemours Company FC LLCStarke48.2 mi96.3
sand pitGoldhead Sand PlantJacksonville48.7 mi97.4
transfer stationMAYPORT SOLID WASTE TRANSFER STATIONJacksonville3.8 mi7.6
transfer stationCOASTAL RECYCLING SERVICESJacksonville10.9 mi21.8
transfer stationWATER RECOVERY, LLCJacksonville13.1 mi26.1
transfer stationREALCO RECYCLING CO., INC. MRFJacksonville13.6 mi27.2
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Contractor
Hubbard Construction Company
49 active projects · Duval
📞 (407) 654-3201

Permits & Sources

Every connector that's seen this project

EARLY SIGNALFDOT Work Program(FDOT Work Program)

State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.

Official source-of-truth portal
Duval County Permits
Jacksonville Building Inspection Division
ConnectorRecord IDCapturedLink
fdot_workprogramFDOTWP_445430152012026-03-08Open ↗

Parcel Detail

Property records and ownership

Property
County
Duval
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

Award

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/fdot-resurfacing-sr10-duval-co-duval-fl-a2b1d0e5