Leads/fdot-resurfacing-sr-838-sunrise-blvdw-of-middle-river-drive-to-east-broward-co-b-d71aedb7
Completed · completeBroward County

FDOT Resurfacing — SR-838/SUNRISE BLVDW OF MIDDLE RIVER DRIVE TO EAST (Broward Co.)

SR-838/SUNRISE BLVDW OF MIDDLE RIVER DRIVE TO EAST OF NE 26TH AVENUE, Broward County, FL

Load estimate pending
Lifecycle
Permitted as of Oct 1, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

FDOT Resurfacing — SR-838/SUNRISE BLVDW OF MIDDLE RIVER DRIVE TO EAST (Broward Co.)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Weekley Asphalt Paving, Inc.
📞 (954) 680-8005
Developer / Applicant

Not yet identified

The story

The FDOT Resurfacing project along SR-838 in Broward County involves roadway improvements and is in the awarded public stage, with construction set for FY2025. This essential public works project presents significant hauling opportunities for providers due to the immediate need for earthwork and material delivery. Key contact for further collaboration is Weekley Asphalt Paving, Inc. at (954) 680-8005.

Why this is a hauling opportunity: FDOT resurfacing project, status: contract executed, in Broward County, FY2025, — contract awarded, hauling needed soon | Connector base: 73 | FDOT/public project (+10) | Roadway/highway work (+10) | Keyword match: 1 categories (+5) | Stage = awarded_public — actionable now (+10) | FDOT public project (+15) | stage=awarded_public, recent (+10) | government/public-authority project (floor 55) | FDOT public project (+15) | stage=awarded_public, recent (+10) | government/public-authority project (floor 55) | FDOT public project (+15) | stage=awarded_public, recent (+10) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-03-08FDOT_WORKPROGRAM
    Captured FDOTWP_44618115201 from fdot_workprogram

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
WHITE ROCK QUARRIES · West Palm Beach
One-way
22.5 mi
Round trip
44.9 mi
TypeNameCityOne-wayRT mi
quarryWHITE ROCK QUARRIESWest Palm Beach22.5 mi44.9
quarryFEC QUARRYMIAMI23.7 mi47.4
quarryPENNSUCO CEMENT PLANTMedley24.0 mi48.1
quarryPENNSUCO QUARRYMedley24.0 mi48.1
quarryEpic Stoneworks, Inc.Cutler Bay28.6 mi57.2
quarryMiami QuarryJacksonville29.0 mi58
quarryMiami Cement PlantMiami30.9 mi61.9
quarryKrome QuarryMIAMI38.9 mi77.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Contractor
Weekley Asphalt Paving, Inc.
Paving
64 active projects · Broward
📞 (954) 680-8005
People (2)
  • DANIEL D · P WEEKLEY
  • WAYNE D · ST WEEKLEY

Permits & Sources

Every connector that's seen this project

EARLY SIGNALFDOT Work Program(FDOT Work Program)

State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.

Official source-of-truth portal
Broward County Permits
Fort Lauderdale area Building Division
ConnectorRecord IDCapturedLink
fdot_workprogramFDOTWP_446181152012026-03-08Open ↗

Parcel Detail

Property records and ownership

Property
County
Broward
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

Award

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/fdot-resurfacing-sr-838-sunrise-blvdw-of-middle-river-drive-to-east-broward-co-b-d71aedb7