FDOT Resurfacing — SR 83 (US 331) FROMS OF SR 8 (I-10) TO SR 10 (US 9 (Walton Co.)
SR 83 (US 331) FROMS OF SR 8 (I-10) TO SR 10 (US 90), Walton County, FL
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
The FDOT Resurfacing project on SR 83 (US 331) from SR 8 (I-10) to SR 10 (US 90) in Walton County, FL, involves critical roadway improvements that are currently underway. This public works project presents significant hauling opportunities for providers, particularly for transporting materials associated with the ongoing resurfacing efforts. Key contact for the project is C.W. Roberts Contracting, Inc., the general contractor, reachable at (813) 756-2009.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_44367325201 from fdot_workprogram
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Mossy Head West | Dothan | 17.5 mi | 35 |
| sand pit | MOSSEYHEAD MINES | CENTURY | 17.5 mi | 35 |
| sand pit | MVM Landfill, LLC | DeFuniak Springs | 19.3 mi | 38.6 |
| sand pit | G2C Sand Mine | Niceville | 28.2 mi | 56.5 |
| sand pit | Panama City Quarry | Murfresboro | 39.7 mi | 79.4 |
| sand pit | Sandhills Plant 2 | Dothan | 43.5 mi | 87.1 |
| quarry | Jones Pit | Chiefland | 47.0 mi | 93.9 |
| quarry | Imperial Rock Mine | Marianna | 48.7 mi | 97.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_44367325201 | 2026-03-08 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Walton
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-resurfacing-sr-83-us-331-froms-of-sr-8-i-10-to-sr-10-us-9-walton-co-walton--bba99f33