FDOT Resurfacing — SR 527 (Orange Co.)
SR 527 FROM MAGNOLIA AVE TO NORTH OF ROLLINSST, Orange County, FL
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
The FDOT Resurfacing project on SR 527 from Magnolia Ave to North of Rollins St in Orange County, FL, is currently under construction and focuses on roadway improvements essential for enhancing transportation infrastructure. This project presents significant hauling opportunities for providers involved in earthwork and material deliveries given its public works nature and active construction phase. Key contact for this project is American Design Engineering Construction Inc., the general contractor, reachable at (305) 868-5717.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_44522015201 from fdot_workprogram
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Four Corners Sand Mine | Brooksville | 19.6 mi | 39.3 |
| sand pit | Center Sand Company | Clermont | 20.0 mi | 40 |
| quarry | S & L Materials Inc | KISSIMMEE | 20.9 mi | 41.8 |
| sand pit | Cypress Sand | Lexington | 20.9 mi | 41.9 |
| sand pit | Independent Mine | Davenport | 21.0 mi | 41.9 |
| sand pit | Hilochee Sand Mine | Davenport | 21.1 mi | 42.2 |
| quarry | FLINT PLANT | Davenport | 21.9 mi | 43.9 |
| sand pit | Davenport Sand Mine | Brooksville | 22.5 mi | 44.9 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_44522015201 | 2026-03-08 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Orange
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-resurfacing-sr-527-orange-co-orange-fl-3ae7e5e3