FDOT Resurfacing — SR 5 (Flagler Co.)
SR 5 FROM NORTH OF PALM COAST PKWY TO SOUTH OF ST JOHNS COUNTY LINE, Flagler County, FL
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
The FDOT resurfacing project on SR 5 in Flagler County, FL, involves significant roadway enhancements that are currently under construction. This public works initiative presents an excellent opportunity for hauling providers to engage in earthwork and materials transportation as construction progresses. Key contact for this project is Masci General Contractors, Inc., reachable at (386) 322-4500 for collaboration and inquiries.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_44521625201 from fdot_workprogram
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | SRM Materials East Palatka | Murfresboro | 20.3 mi | 40.5 |
| sand pit | Keuka Sand Plant | Jacksonville | 41.5 mi | 83 |
| quarry | Edgar Minerals, Inc. | Davenport | 42.9 mi | 85.7 |
| sand pit | Grandin Sand Plant | Jacksonville | 43.5 mi | 86.9 |
| sand pit | Lynne Mine | Davenport | 47.0 mi | 94 |
| sand pit | Goldhead Sand Plant | Jacksonville | 48.5 mi | 97 |
| landfill | FLAGLER CDS, INCORPORATED C&D DEBRIS FACILITY | Bunnell | 5.2 mi | 10.4 |
| transfer station | ORMOND BEACH TRANSFER STATION | Ormond Beach | 20.1 mi | 40.2 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_44521625201 | 2026-03-08 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Flagler
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-resurfacing-sr-5-flagler-co-flagler-fl-322071fe