FDOT Resurfacing — SR 300 CR 300 BEACHDR TO SR 30 (US 98/319) (Franklin Co.)
SR 300 CR 300 BEACHDR TO SR 30 (US 98/319), Franklin County, FL
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
The FDOT resurfacing project on SR 300 from Beach Drive to SR 30 (US 98/319) in Franklin County, FL, is a public works initiative currently under construction focusing on roadway improvements. This project presents a significant opportunity for hauling providers due to the requirement for earthwork, materials transport, and potential demolition associated with road resurfacing. Key contact for this project is the prime general contractor, Pigott Asphalt and Sitework, LLC, reachable at (850) 926-4840.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_44697425601 from fdot_workprogram
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| transfer station | FRANKLIN COUNTY CENTRAL LANDFILL | Eastpoint | 9.8 mi | 19.6 |
| landfill | FIVE POINTS CLASS III LANDFILL | Port St Joe | 18.4 mi | 36.8 |
| transfer station | INDUSTRIAL ROAD TRANSFER STATION | Port St Joe | 19.6 mi | 39.3 |
| landfill | BLOUNTSTOWN C&D DISPOSAL FACILITY | Blountstown | 48.6 mi | 97.2 |
| landfill | (unnamed) | — | 2.1 mi | 4.3 |
| landfill | (unnamed) | — | 9.9 mi | 19.9 |
| landfill | (unnamed) | — | 10.2 mi | 20.5 |
| landfill | (unnamed) | — | 18.4 mi | 36.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_44697425601 | 2026-03-08 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Franklin
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-resurfacing-sr-300-cr-300-beachdr-to-sr-30-us-98-319-franklin-co-franklin-f-c6ca6e48