FDOT Resurfacing — SR 30 (US 98) (Okaloosa Co.)
SR 30 (US 98) FROM WEST OF PARAISO BLVD TO EAST OF REGIONS WAY, Okaloosa County, FL
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
**FDOT Resurfacing — SR 30 (US 98), Okaloosa County, FL** This is an active FDOT roadway resurfacing project currently under construction on SR 30 (US 98) from west of Paraiso Boulevard to east of Regions Way in Okaloosa County, with significant hauling demand for debris removal, milling waste, and aggregate materials typical of highway resurfacing work. Anderson Columbia Co., Inc. is the prime general contractor (386-752-7585), making them the primary contact for sub-hauling opportunities and material transport logistics. With a hauling score of 75/100 and ongoing construction activity, this represents a near-term opportunity for dedicated haul routes supporting active resurfacing operations.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_22001725202 from fdot_workprogram
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_45354815201 from fdot_workprogram
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | River Road Pit | Navarre | 1.4 mi | 2.8 |
| sand pit | Quikrete Mine | MILTON | 17.1 mi | 34.1 |
| sand pit | G2C Sand Mine | Niceville | 30.0 mi | 59.9 |
| sand pit | Devine Pit | CANTONMENT | 31.4 mi | 62.8 |
| sand pit | Molino Pit | Cantonment | 38.6 mi | 77.1 |
| sand pit | Mossy Head West | Dothan | 41.0 mi | 82 |
| sand pit | MOSSEYHEAD MINES | CENTURY | 41.0 mi | 82 |
| sand pit | MVM Landfill, LLC | DeFuniak Springs | 47.1 mi | 94.1 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_22001725202 | 2026-03-08 | Open ↗ |
| fdot_workprogram | FDOTWP_45354815201 | 2026-03-08 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Okaloosa
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-resurfacing-sr-30-us-98-okaloosa-co-okaloosa-fl-9d8c4e3e