Leads/fdot-resurfacing-ride-o-sr-5-us-1-biscayne-blv-miami-dade-co-miami-dade-fl-7e4abc06
Completed · completeMiami-Dade County

FDOT Resurfacing - Ride O — SR 5/US 1/BISCAYNE BLV (Miami-Dade Co.)

SR 5/US 1/BISCAYNE BLV FROM NE 61 ST TO NE 6AVE, Miami-Dade County, FL

Load estimate pending
Lifecycle
Active as of Jul 1, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

FDOT Resurfacing - Ride O — SR 5/US 1/BISCAYNE BLV (Miami-Dade Co.)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
National Traffic Solution, Inc.
📞 (786) 508-7600
Developer / Applicant

Not yet identified

The story

The FDOT Resurfacing project on SR 5/US 1/Biscayne Blvd in Miami-Dade County focuses on improving the roadway infrastructure and is currently in active construction. This project presents significant hauling opportunities, particularly for transporting materials needed for road resurfacing and earthwork, given its high hauling score of 100/100. Key contact for this project is National Traffic Solution, Inc., the general contractor, reachable at (786) 508-7600.

Why this is a hauling opportunity: FDOT resurfacing - ride o project, status: under construction, in Miami-Dade County, FY2026, — active construction, hauling in progress | Connector base: 65 | FDOT/public project (+10) | Roadway/highway work (+10) | Keyword match: 1 categories (+5) | Stage = under_construction — actionable now (+10) | FDOT public project (+15) | stage=under_construction, recent (+10) | government/public-authority project (floor 55) | FDOT public project (+15) | stage=under_construction, recent (+10) | government/public-authority project (floor 55) | FDOT public project (+15) | stage=under_construction, recent (+10) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-03-08FDOT_WORKPROGRAM
    Captured FDOTWP_44599615A01 from fdot_workprogram

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Epic Stoneworks, Inc. · Cutler Bay
One-way
7.9 mi
Round trip
15.8 mi
TypeNameCityOne-wayRT mi
quarryEpic Stoneworks, Inc.Cutler Bay7.9 mi15.8
quarryMiami QuarryJacksonville12.2 mi24.5
quarryFEC QUARRYMIAMI12.8 mi25.6
quarryPENNSUCO QUARRYMedley13.1 mi26.3
quarryPENNSUCO CEMENT PLANTMedley13.1 mi26.3
quarryMiami Cement PlantMiami14.3 mi28.6
quarryWHITE ROCK QUARRIESWest Palm Beach17.2 mi34.3
quarryKrome QuarryMIAMI19.0 mi38.1
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Contractor
National Traffic Solution, Inc.
3 active projects · Miami-Dade
📞 (786) 508-7600
People (5)
  • FRANK Y · VP RIVERA
  • estimating@trafficsolution.us✉︎
  • filler@godaddy.com✉︎
  • impallari@gmail.com✉︎
  • micah@micahrich.com✉︎

Permits & Sources

Every connector that's seen this project

EARLY SIGNALFDOT Work Program(FDOT Work Program)

State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.

Official source-of-truth portal
Miami-Dade County Permits
Search by address, folio, or permit number
ConnectorRecord IDCapturedLink
fdot_workprogramFDOTWP_44599615A012026-03-08Open ↗

Parcel Detail

Property records and ownership

Property
County
Miami-Dade
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

Award

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/fdot-resurfacing-ride-o-sr-5-us-1-biscayne-blv-miami-dade-co-miami-dade-fl-7e4abc06