FDOT Resurfacing — I-95(SR9) FROM: AIRPORT ROAD TO: OWENS ROAD (Duval Co.)
I-95(SR9) FROM: AIRPORT ROAD TO: OWENS ROAD, Duval County, FL
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
The FDOT resurfacing project on I-95 from Airport Road to Owens Road in Duval County is a significant public works initiative currently under construction. This project presents a critical hauling opportunity for providers involved in earthwork and materials delivery, as the construction is active and requires immediate logistics support. Preferred Materials Inc. serves as the general contractor and can be reached at (813) 973-2888 for further collaboration on hauling needs.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_44604915201 from fdot_workprogram
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Dames Point Terminal | Brooksville | 7.1 mi | 14.3 |
| quarry | The Chemours Company FC LLC | Starke | 36.5 mi | 72.9 |
| sand pit | Goldhead Sand Plant | Jacksonville | 39.2 mi | 78.4 |
| sand pit | Grandin Sand Plant | Jacksonville | 44.2 mi | 88.5 |
| quarry | SRM Materials East Palatka | Murfresboro | 44.8 mi | 89.7 |
| transfer station | WATER RECOVERY, LLC | Jacksonville | 1.5 mi | 2.9 |
| transfer station | REALCO RECYCLING CO., INC. MRF | Jacksonville | 5.5 mi | 11 |
| landfill | OLD KINGS ROAD LLC | Jacksonville | 8.3 mi | 16.6 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_44604915201 | 2026-03-08 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Duval
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-resurfacing-i-95-sr9-from-airport-road-to-owens-road-duval-co-duval-fl-0251bf10