FDOT Resurfacing — I-95 (Brevard Co.)
I-95 FROM SR514 (MALABAR RD) TO CONCRETE JOINT N OF SR519 (FISKE BLVD), Brevard County, FL
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
FDOT is actively resurfacing a 6+ mile stretch of I-95 in Brevard County (SR514 to SR519) with significant earthwork and asphalt removal/hauling demands. This public works project presents strong opportunities for demolition debris, reclaimed asphalt pavement (RAP), and aggregate hauling given the under-construction status and high hauling score (75/100). Primary contact is OHLA USA Inc (prime GC) at (786) 418-3740—direct outreach recommended for active material transport and disposal needs.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_44897715201 from fdot_workprogram
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_45459915201 from fdot_workprogram
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Brisbane Pit | Fellsmere | 6.3 mi | 12.6 |
| sand pit | Sunshine Mine | Fort Pierce | 7.1 mi | 14.2 |
| sand pit | Vero Rock and Sand | Vero Beach | 16.5 mi | 33 |
| sand pit | Blue Goose Mine | Fort Pierce | 17.2 mi | 34.5 |
| quarry | Buck Hammock | Orlando | 20.9 mi | 41.8 |
| quarry | Capron Trails Mine | Jupiter | 29.2 mi | 58.3 |
| quarry | Rock Solid Rock, LLC | Titusville | 39.1 mi | 78.1 |
| quarry | S & L Materials Inc | KISSIMMEE | 44.6 mi | 89.2 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_44897715201 | 2026-03-08 | Open ↗ |
| fdot_workprogram | FDOTWP_45459915201 | 2026-03-08 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Brevard
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-resurfacing-i-95-brevard-co-brevard-fl-d3fd65e6