FDOT Resurfacing — 43RD AVENUE 6TH STREET TO 12TH STREET (Indian River Co.)
43RD AVENUE 6TH STREET TO 12TH STREET, Indian River County, FL
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
The FDOT Resurfacing project on 43rd Avenue from 6th Street to 12th Street in Indian River County, FL, involves critical roadway improvements and is currently in the approved stage for FY2026. This project presents significant hauling opportunities for providers, particularly for materials and earthwork, as it not only enhances public infrastructure but also serves as a pivotal connector. Key contact for this project is Ranger Construction Industries, Inc., the general contractor, who can be reached at (561) 793-9400.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_44427025401 from fdot_workprogram
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Blue Goose Mine | Fort Pierce | 7.4 mi | 14.7 |
| sand pit | Vero Rock and Sand | Vero Beach | 7.9 mi | 15.7 |
| quarry | Capron Trails Mine | Jupiter | 9.1 mi | 18.2 |
| sand pit | Sunshine Mine | Fort Pierce | 18.7 mi | 37.5 |
| quarry | Brisbane Pit | Fellsmere | 20.0 mi | 39.9 |
| quarry | Fort Pierce Mine | Jacksonville | 25.9 mi | 51.8 |
| quarry | 1412 Canal Point | Hammond | 38.5 mi | 77 |
| sand pit | Palm City Mine | Greenacres | 39.2 mi | 78.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_44427025401 | 2026-03-08 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Indian River
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-resurfacing-43rd-avenue-6th-street-to-12th-street-indian-river-co-indian-ri-4ff2aff9