Leads/fdot-rest-area-sr20-us19-us27-wayside-park-rest-area-improvements-taylor-co-tayl-828a090f
Active · clearingTaylor County

FDOT Rest Area — SR20(US19/US27)WAYSIDE PARK REST AREA IMPROVEMENTS (Taylor Co.)

SR20(US19/US27)WAYSIDE PARK REST AREA IMPROVEMENTS, Taylor County, FL

Load estimate pending
Lifecycle
Permitted as of Feb 18, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

FDOT Rest Area — SR20(US19/US27)WAYSIDE PARK REST AREA IMPROVEMENTS (Taylor Co.)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$9.3M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
5
Public records referencing this job
General Contractor
J.B. Coxwell Contracting, Inc.
📞 (904) 786-1120
Developer / Applicant

Not yet identified

The story

The FDOT Rest Area Improvements project located on SR20(US19/US27) in Taylor County, FL, involves roadway enhancements that can significantly impact local traffic and service amenities. Hauling providers should anticipate opportunities for earthwork and material transport during this public works initiative, as it has a high hauling score of 85, indicating robust logistics demand. Key contacts for this project include Carr Construction, LLC as the prime contractor, along with several subcontractors such as V.A. Paving, Inc. and J.B. Coxwell Contracting, Inc., all of whom may require hauling services.

Why this is a hauling opportunity: FDOT awarded contract on (US 1) FROM MIDWAY RD TO S OF EDWARDS RD | FDOT public project (+15) | size signal: $9,321,660 valuation (+20) | stage=awarded_public, recent (+10) | FDOT public project (+15) | size signal: $9,321,660 valuation (+20) | stage=awarded_public, recent (+10) | FDOT public project (+15) | size signal: $9,321,660 valuation (+20) | stage=awarded_public, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-03-08FDOT_WORKPROGRAM
    Captured FDOTWP_43860325201 from fdot_workprogram
  2. 2026-03-23FDOT_LETTING
    Captured CO_T4750 from fdot_letting
  3. 2026-03-23FDOT_LETTING
    Captured CO_T1906 from fdot_letting
  4. 2026-03-23FDOT_LETTING
    Captured CO_T2A28 from fdot_letting
  5. 2026-03-23FDOT_LETTING
    Captured CO_T5850 from fdot_letting

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
SRM Materials Cabbage Grove · Lamont
One-way
0.4 mi
Round trip
0.7 mi
TypeNameCityOne-wayRT mi
quarrySRM Materials Cabbage GroveLamont0.4 mi0.7
quarryPerry QuarryFort Myers22.7 mi45.4
quarryCYD Cabbage GroveDaytona Beach23.2 mi46.4
quarryBlue Rok Incorporatedperry24.8 mi49.6
quarrySwift Creek MineWhite Springs38.8 mi77.5
quarrySUWANNEE COUNTY PUBLIC WORKSLIVE OAK43.5 mi87.1
quarryDixie County PitCross City43.8 mi87.5
quarryBeachville MineLive Oak44.3 mi88.7
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Contractor
J.B. Coxwell Contracting, Inc.
11 active projects · Duval
📞 (904) 786-1120
Subcontractor
KIEWIT INFRASTRUCTURE SOUTH CO.
Civil
4 active projects · Monroe
📞 (954) 835-2228
People (6)
  • TIMOTHY J · SVP CLEARY
  • TIMOTHY J · SVP CLEARY
  • JAMES M NOLAN · CONTROLLER
  • JAMES M NOLAN · CONTROLLER
  • STEPHEN S · T THOMAS
  • STEPHEN S · T THOMAS

Permits & Sources

Every connector that's seen this project

EARLY SIGNALFDOT Work Program(FDOT Work Program)

State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.

Official source-of-truth portal
Taylor County Permits
Perry Building Department
ConnectorRecord IDCapturedLink
fdot_workprogramFDOTWP_438603252012026-03-08Open ↗
fdot_lettingCO_T47502026-03-23Open ↗
fdot_lettingCO_T19062026-03-23Open ↗
fdot_lettingCO_T2A282026-03-23Open ↗
fdot_lettingCO_T58502026-03-23Open ↗

Parcel Detail

Property records and ownership

Property
County
Taylor
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

Award

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/fdot-rest-area-sr20-us19-us27-wayside-park-rest-area-improvements-taylor-co-tayl-828a090f