Leads/fdot-rest-area-dual-i-95-sr9-st-johns-northbound-rest-area-st-johns-co-st-johns--5e3cf6a8
Approved · mobilizationSt. Johns County

FDOT Rest Area (Dual) — I-95(SR9) ST JOHNS NORTHBOUND REST AREA (St. Johns Co.)

I-95(SR9) ST JOHNS NORTHBOUND REST AREA, St. Johns County, FL

Load estimate pending
Lifecycle
Permitted as of Apr 14, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

FDOT Rest Area (Dual) — I-95(SR9) ST JOHNS NORTHBOUND REST AREA (St. Johns Co.)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$6.0M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor
Masci General Contractors, Inc
📞 (386) 322-4500
Developer / Applicant

Not yet identified

The story

The FDOT Rest Area project on I-95 Northbound in St. Johns County, FL, involves significant roadway construction and is in the public works category. This project presents an excellent hauling opportunity for providers, particularly for earthwork and materials transport, given its high hauling score and current awarded stage. Key contacts include Masci General Contractors, Inc. and P & S Paving, Inc., both of whom can be reached at (386) 322-4500 and (203) 881-9145, respectively.

Why this is a hauling opportunity: FDOT awarded contract on FROM W OF I-95 TO E OF S WALKER DR 45064215202 | Connector base: 85 | FDOT/public project (+10) | Roadway/highway work (+10) | Keyword match: 1 categories (+5) | Stage = awarded_public — actionable now (+10) | FDOT public project (+15) | size signal: $5,958,391 valuation (+20) | stage=awarded_public, recent (+10) | FDOT public project (+15) | size signal: $5,958,391 valuation (+20) | stage=awarded_public, recent (+10) | FDOT public project (+15) | size signal: $5,958,391 valuation (+20) | stage=awarded_public, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-03-08FDOT_WORKPROGRAM
    Captured FDOTWP_43861015201 from fdot_workprogram
  2. 2026-04-24FDOT_LETTING
    Captured CO_T5877 from fdot_letting

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
SRM Materials East Palatka · Murfresboro
One-way
12.0 mi
Round trip
24.1 mi
TypeNameCityOne-wayRT mi
quarrySRM Materials East PalatkaMurfresboro12.0 mi24.1
sand pitKeuka Sand PlantJacksonville35.7 mi71.5
sand pitGrandin Sand PlantJacksonville35.8 mi71.5
quarryEdgar Minerals, Inc.Davenport37.5 mi75
sand pitGoldhead Sand PlantJacksonville39.5 mi79
quarryThe Chemours Company FC LLCStarke47.5 mi94.9
sand pitLynne MineDavenport48.6 mi97.2
quarryDames Point TerminalBrooksville49.6 mi99.2
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Contractor
Masci General Contractors, Inc
27 active projects · Seminole
📞 (386) 322-4500
Subcontractor
SEMA CONSTRUCTION, INC.
4 active projects · Sarasota
📞 (303) 627-2600
People (1)

Permits & Sources

Every connector that's seen this project

EARLY SIGNALFDOT Work Program(FDOT Work Program)

State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.

Official source-of-truth portal
St. Johns County Permits
Ponte Vedra / St. Augustine Building
ConnectorRecord IDCapturedLink
fdot_workprogramFDOTWP_438610152012026-03-08Open ↗
fdot_lettingCO_T58772026-04-24Open ↗

Parcel Detail

Property records and ownership

Property
County
St. Johns
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

Award

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/fdot-rest-area-dual-i-95-sr9-st-johns-northbound-rest-area-st-johns-co-st-johns--5e3cf6a8