Leads/fdot-pavement-only-resurf-sr-555-us-17-fromn-of-transport-rd-to-avenue-g-s-polk--7973d243
Active · punchlistPolk County

FDOT Pavement Only Resurfacing — SR 555 (US 17) FROMN OF TRANSPORT RD TO AVENUE G S (Polk Co.)

SR 555 (US 17) FROMN OF TRANSPORT RD TO AVENUE G SW, Polk County, FL

Load estimate pending
Lifecycle
Active as of Jul 1, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

FDOT Pavement Only Resurfacing — SR 555 (US 17) FROMN OF TRANSPORT RD TO AVENUE G S (Polk Co.)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Hubbard Construction Company
📞 (407) 654-3201
Developer / Applicant

Not yet identified

The story

The FDOT Pavement Only Resurfacing project on SR 555 (US 17) from Transport Rd to Avenue G in Polk County, FL, is focused on roadway enhancement and is currently under construction. This project is a significant opportunity for hauling providers due to its extensive earthwork and materials needs, particularly for roadway and asphalt delivery. Key contacts include prime general contractors Hubbard Construction Company and Preferred Materials Inc., along with their subcontractors, providing avenues for collaboration and securing hauling contracts.

Why this is a hauling opportunity: FDOT awarded contract on (US 17 / N MAIN ST) FROM TROUT RIVER BRIDGE TO N OF... | Connector base: 85 | FDOT/public project (+10) | Roadway/highway work (+10) | Keyword match: 1 categories (+5) | Stage = awarded_public — actionable now (+10) | FDOT public project (+15) | stage=under_construction, recent (+10) | government/public-authority project (floor 55) | FDOT public project (+15) | stage=under_construction, recent (+10) | government/public-authority project (floor 55) | FDOT public project (+15) | stage=under_construction, recent (+10) | government/public-authority project (floor 55) | FDOT public project (+15) | stage=under_construction, recent (+10) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-03-08FDOT_WORKPROGRAM
    Captured FDOTWP_44742815201 from fdot_workprogram

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

No material sources within 50 mi. Coverage outside Florida is pending — see /material-sources.

Contact Graph

Who's involved and how

Contractor
Hubbard Construction Company
49 active projects · Duval
📞 (407) 654-3201
Subcontractor
DUVAL ASPHALT PRODUCTS, INC.
Paving
13 active projects · Duval
📞 (904) 296-2020
People (2)
  • PAUL M JURGENSEN · CEO
  • KIMBERLY · AS ROWELL

Permits & Sources

Every connector that's seen this project

EARLY SIGNALFDOT Work Program(FDOT Work Program)

State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.

Official source-of-truth portal
Polk County Permits
Lakeland / Winter Haven permit search
ConnectorRecord IDCapturedLink
fdot_workprogramFDOTWP_447428152012026-03-08Open ↗

Parcel Detail

Property records and ownership

Property
County
Polk
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

Award

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/fdot-pavement-only-resurf-sr-555-us-17-fromn-of-transport-rd-to-avenue-g-s-polk--7973d243