FDOT Pavement Only Resurfacing — SR 518 (EAU GALLIE BLVD) (Brevard Co.)
SR 518 (EAU GALLIE BLVD) FROM SARNO RD TO WEST OF APOLLO BLVD, Brevard County, FL
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
The FDOT Pavement Only Resurfacing project along SR 518 (Eau Gallie Blvd) in Brevard County, FL, involves roadway enhancements that are currently under construction. This project presents significant hauling opportunities for transporting materials such as asphalt and aggregates critical for resurfacing activities. The primary contact for coordination and potential hauling agreements is Jr. Davis Construction Co., Inc., the general contractor, reachable at (407) 870-0066.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_44521315201 from fdot_workprogram
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Rock Solid Rock, LLC | Titusville | 10.0 mi | 20.1 |
| quarry | Beeline Mine | Orlando | 13.6 mi | 27.3 |
| quarry | S & L Materials Inc | KISSIMMEE | 16.5 mi | 33.1 |
| quarry | Buck Hammock | Orlando | 36.3 mi | 72.7 |
| transfer station | TITUSVILLE TRANSFER STATION | Titusville | 4.2 mi | 8.3 |
| landfill | KSC SCHWARTZ ROAD LANDFILL CLASS III | Orlando | 11.3 mi | 22.7 |
| landfill | BREVARD CENTRAL LANDFILL | Cocoa | 14.7 mi | 29.5 |
| transfer station | OSCEOLA RD SOLID WASTE MGMT FACILITY-CLASS I LANDFILL | Geneva | 21.1 mi | 42.2 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_44521315201 | 2026-03-08 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Brevard
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-pavement-only-resurf-sr-518-eau-gallie-blvd-brevard-co-brevard-fl-be092896