FDOT — (US 17 / N MAIN ST) FROM TROUT RIVER BRIDGE TO N OF...
SR 35 (US 17) FROM HARDEE COUNTY LINE TO N OF BRIDGE 160079, Polk County, FL
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
The FDOT construction project involves roadway work on US 17/N Main St from the Trout River Bridge to north of Bridge 160079 in Polk County, FL, and is currently in the awarded stage. This public works initiative presents significant hauling opportunities for providers, especially for earthwork, materials transport, and demolition as infrastructure improvements are made. Key contacts include prime general contractors like Gosalia Concrete Constructors, Preferred Materials Inc., AJAX Paving Industries of Florida, Hubbard Construction Company, and V.A. Paving, all of whom will require various hauling services to complete the project efficiently.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_44923115701 from fdot_workprogram
- 2026-05-19FDOT_LETTINGCaptured CO_2025_T5850 from fdot_letting
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Four Corners | Lithia | 12.1 mi | 24.2 |
| quarry | South Fort Meade Mine | Lithia | 17.9 mi | 35.9 |
| quarry | South Pasture Mine | Lithia | 18.5 mi | 37 |
| sand pit | Diamond Sand Plant | Jacksonville | 20.4 mi | 40.7 |
| sand pit | Haines City Mine | Davenport | 20.5 mi | 41 |
| sand pit | Lake Wales Dry Plant | Davenport | 20.6 mi | 41.3 |
| sand pit | Lake Wales Sand Mine | Brooksville | 20.6 mi | 41.3 |
| sand pit | SILICA PLANT | Davenport | 25.2 mi | 50.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
- ARNOLD A JR · VTD MALLARD
- TERRI M · VSD HART
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_44923115701 | 2026-03-08 | Open ↗ |
| fdot_letting | CO_2025_T5850 | 2026-05-19 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Polk
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-pavement-only-resurf-sr-35-us-17-polk-co-polk-fl-281e58eb