Leads/fdot-pavement-only-resurf-sr-35-sr-555-us-17-polk-co-polk-fl-7614f2cc
Active · pavingPolk County

FDOT Pavement Only Resurfacing — SR 35/SR 555 (US 17) (Polk Co.)

SR 35/SR 555 (US 17) FROM SOUTH OF MINE ROADTO SOUTH OF GATE ROAD, Polk County, FL

Load estimate pending
Lifecycle
Active as of Jul 1, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

FDOT Pavement Only Resurfacing — SR 35/SR 555 (US 17) (Polk Co.)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$7.4M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor
C.W. Roberts Contracting, Inc.
📞 (813) 756-2009
Developer / Applicant

Not yet identified

The story

The FDOT Pavement Only Resurfacing project on SR 35/SR 555 (US 17) in Polk County, FL, focuses on roadway improvements and is currently under construction. This public works project presents significant hauling opportunities for excavation and materials as it involves extensive asphalt work and possibly roadway base adjustments. Key contacts for this project include C.W. Roberts Contracting, Inc. and AJAX Paving Industries of Florida LLC, both serving as prime general contractors, along with their subcontractors, who may require hauling services throughout the project duration.

Why this is a hauling opportunity: FDOT awarded contract on (US 17) FROM S OF PINEGROVE CR TO N OF WASHINGTON LOOP | Connector base: 85 | FDOT/public project (+10) | Roadway/highway work (+10) | Keyword match: 1 categories (+5) | Stage = awarded_public — actionable now (+10) | FDOT public project (+15) | size signal: $7,440,041 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $7,440,041 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $7,440,041 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $7,440,041 valuation (+20) | stage=under_construction, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-03-08FDOT_WORKPROGRAM
    Captured FDOTWP_44743015201 from fdot_workprogram
  2. 2026-04-24FDOT_LETTING
    Captured CO_T1919 from fdot_letting

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

No material sources within 50 mi. Coverage outside Florida is pending — see /material-sources.

Contact Graph

Who's involved and how

Contractor
C.W. Roberts Contracting, Inc.
137 active projects · Okaloosa
📞 (813) 756-2009
People (8)
  • III P.O. BOX FRED J · CEO SMITH
  • JAMES · VP STRAIN
  • GREGORY A P.O. BOX · V HOFFMAN
  • JAMES W PO BOX · V MORETZ
  • MATTHEW · CFO STEELE
  • MORGAN P.O. BOX · AS QUIRK
  • +2 more
Subcontractor
AJAX PAVING INDUSTRIES OF FLORIDA LLC
Paving
61 active projects · Manatee
📞 (813) 574-8331
People (1)

Permits & Sources

Every connector that's seen this project

EARLY SIGNALFDOT Work Program(FDOT Work Program)

State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.

Official source-of-truth portal
Polk County Permits
Lakeland / Winter Haven permit search
ConnectorRecord IDCapturedLink
fdot_workprogramFDOTWP_447430152012026-03-08Open ↗
fdot_lettingCO_T19192026-04-24Open ↗

Parcel Detail

Property records and ownership

Property
County
Polk
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

Award

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/fdot-pavement-only-resurf-sr-35-sr-555-us-17-polk-co-polk-fl-7614f2cc