Leads/fdot-pavement-only-resurf-sr-25-us-27-polk-co-polk-fl-58d5c3b4
Active · pavingPolk County

FDOT Pavement Only Resurfacing — SR 25 (US 27) (Polk Co.)

SR 25 (US 27) FROM N OF SR 60 TO N OF SR 540(CYPRESS GARDENS BLVD), Polk County, FL

Load estimate pending
Lifecycle
Filed as of Jan 1, 2027
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

FDOT Pavement Only Resurfacing — SR 25 (US 27) (Polk Co.)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor
Hubbard Construction Company
📞 (407) 654-3201
Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT pavement only resurf project, status: pre-const.underway, in Polk County, FY2028, — early stage, build relationships now | FDOT public project (+15) | government/public-authority project (floor 55) | FDOT public project (+15) | government/public-authority project (floor 55) | FDOT public project (+15) | government/public-authority project (floor 55) | FDOT public project (+15) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-03-08FDOT_WORKPROGRAM
    Captured FDOTWP_45088715201 from fdot_workprogram
  2. 2026-03-08FDOT_WORKPROGRAM
    Captured FDOTWP_45088515201 from fdot_workprogram

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
Haines City Mine · Davenport
One-way
8.7 mi
Round trip
17.4 mi
TypeNameCityOne-wayRT mi
sand pitHaines City MineDavenport8.7 mi17.4
sand pitDiamond Sand PlantJacksonville12.8 mi25.5
sand pitLake Wales Sand MineBrooksville12.8 mi25.7
sand pitLake Wales Dry PlantDavenport12.8 mi25.7
sand pitSILICA PLANTDavenport14.3 mi28.6
sand pitDavenport Sand MineBrooksville14.5 mi29
quarryFLINT PLANTDavenport15.1 mi30.2
sand pitGator Sand MineBrooksville17.9 mi35.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Contractor
Hubbard Construction Company
49 active projects · Duval
📞 (407) 654-3201

Permits & Sources

Every connector that's seen this project

EARLY SIGNALFDOT Work Program(FDOT Work Program)

State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.

Official source-of-truth portal
Polk County Permits
Lakeland / Winter Haven permit search
ConnectorRecord IDCapturedLink
fdot_workprogramFDOTWP_450887152012026-03-08Open ↗
fdot_workprogramFDOTWP_450885152012026-03-08Open ↗

Parcel Detail

Property records and ownership

Property
County
Polk
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

Award

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/fdot-pavement-only-resurf-sr-25-us-27-polk-co-polk-fl-58d5c3b4