FDOT Pave Shoulders — FORT SMITH BLVD (Volusia Co.)
FORT SMITH BLVD FROM ELKCAM BLVD TO PROVIDENCE BLVD, Volusia County, FL
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 7/1/2027 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
The FDOT Pave Shoulders project in Volusia County, FL, involves roadway improvements along Fort Smith Blvd from Elkcam Blvd to Providence Blvd, with a focus on enhancing traffic safety. This project presents significant hauling opportunities, particularly for providers involved in earthwork and material supply, as it is in the early stages and will require various materials for construction. Key contacts for this project include the Florida Department of Transportation, which is overseeing the initiative, and local contractors who will be involved as the project advances towards construction in FY2028.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_44397915801 from fdot_workprogram
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Lisbon Sand | Lexington | 30.1 mi | 60.2 |
| sand pit | Weirsdale Sand Plant | Jacksonville | 33.9 mi | 67.7 |
| sand pit | Astatula Sand Plant | Jacksonville | 34.4 mi | 68.7 |
| sand pit | Lynne Mine | Davenport | 38.1 mi | 76.2 |
| quarry | Beeline Mine | Orlando | 40.5 mi | 81 |
| sand pit | Okahumpka | Leesburg | 40.7 mi | 81.5 |
| quarry | S & L Materials Inc | KISSIMMEE | 42.4 mi | 84.8 |
| sand pit | Independent Mine | Davenport | 42.7 mi | 85.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_44397915801 | 2026-03-08 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Volusia
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-pave-shoulders-fort-smith-blvd-volusia-co-volusia-fl-991c8b67