FDOT Landscaping — US 27 (SR 25) AT SR60 INTERCHANGE (Polk Co.)
US 27 (SR 25) AT SR60 INTERCHANGE, Polk County, FL
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
The FDOT Landscaping project at the US 27 and SR 60 interchange in Polk County, Florida, is a public works initiative currently under construction that involves significant earthwork and landscaping. This project presents a crucial opportunity for hauling providers to engage in transporting materials and debris as the work involves extensive site preparations and potential demolition elements. Key contacts for this project include OHLA USA Inc as the general contractor, with additional subcontractors such as General Asphalt Company, creating multiple pathways for collaboration.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_43365715201 from fdot_workprogram
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Diamond Sand Plant | Jacksonville | 5.5 mi | 10.9 |
| sand pit | Lake Wales Sand Mine | Brooksville | 5.7 mi | 11.5 |
| sand pit | Lake Wales Dry Plant | Davenport | 5.7 mi | 11.5 |
| sand pit | Haines City Mine | Davenport | 12.4 mi | 24.7 |
| quarry | South Fort Meade Mine | Lithia | 19.8 mi | 39.6 |
| sand pit | SILICA PLANT | Davenport | 19.8 mi | 39.6 |
| sand pit | Davenport Sand Mine | Brooksville | 20.0 mi | 40 |
| quarry | FLINT PLANT | Davenport | 20.5 mi | 41 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_43365715201 | 2026-03-08 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Polk
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-landscaping-us-27-sr-25-at-sr60-interchange-polk-co-polk-fl-edaeb203