FDOT — A (US 1/KING ST) OVER SAN SEBASTIAN RIVER BRIDGE NO...
US 19/SR 55 FROM CYPRESS ST TO PINELLAS TRAIL, FL
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
The FDOT construction project involves the reconstruction of the US 1/KING ST bridge over the San Sebastian River in Florida, encompassing essential public works work to enhance transportation infrastructure. This project is critical for hauling providers as it requires extensive earthwork, materials transportation, and potential demolition efforts. Key contacts for this project include Carr Construction, LLC (prime GC), Kiewit Infrastructure South Co. (subcontractor), and J.B. Coxwell Contracting, Inc. (prime GC), presenting actionable opportunities for logistics in the ongoing construction.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_44442415201 from fdot_workprogram
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Weirsdale Sand Plant | Jacksonville | 10.8 mi | 21.6 |
| quarry | SUMTERVILLE QUARRY | Ocala | 13.2 mi | 26.5 |
| quarry | NORTH MINE | OCALA | 13.3 mi | 26.6 |
| quarry | Sumterville Cement Plant | Sumterville | 13.6 mi | 27.2 |
| quarry | SUMTERVILLE MINE | Ocala | 13.6 mi | 27.2 |
| sand pit | Okahumpka | Leesburg | 16.7 mi | 33.4 |
| sand pit | Lisbon Sand | Lexington | 16.8 mi | 33.6 |
| quarry | St Catherine Mine | Brooksville | 17.2 mi | 34.3 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_44442415201 | 2026-03-08 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pinellas
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-landscaping-us-19-sr-55-pinellas-co-pinellas-fl-fe2265d3