Leads/fdot-bridge-replacement-sr55-us221-woods-creek-bridge-number-380009-taylor-co-ta-89a403e6
Active · pavingTaylor County

FDOT Bridge Replacement — SR55(US221) WOODS CREEK BRIDGE NUMBER 380009 (Taylor Co.)

SR55(US221) WOODS CREEK BRIDGE NUMBER 380009, Taylor County, FL

Load estimate pending
Lifecycle
Active as of Jul 1, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

FDOT Bridge Replacement — SR55(US221) WOODS CREEK BRIDGE NUMBER 380009 (Taylor Co.)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Anderson Columbia Co., Inc.
📞 (386) 752-7585
Developer / Applicant

Not yet identified

The story

The FDOT Bridge Replacement project at Woods Creek Bridge on SR55 (US221) in Taylor County, FL, focuses on roadway construction and is currently under construction. This project presents significant hauling opportunities for material transportation and earthwork as it progresses, with a perfect hauling score indicating high demand. Key contact for this project is Anderson Columbia Co., Inc., the general contractor, who can be reached at (386) 752-7585 for further collaboration.

Why this is a hauling opportunity: FDOT bridge replacement project, status: under construction, in Taylor County, FY2025, — active construction, hauling in progress | Connector base: 90 | FDOT/public project (+10) | Roadway/highway work (+10) | Keyword match: 1 categories (+5) | Stage = under_construction — actionable now (+10) | FDOT public project (+15) | stage=under_construction, recent (+10) | government/public-authority project (floor 55) | FDOT public project (+15) | stage=under_construction, recent (+10) | government/public-authority project (floor 55) | FDOT public project (+15) | stage=under_construction, recent (+10) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-03-08FDOT_WORKPROGRAM
    Captured FDOTWP_44514715201 from fdot_workprogram

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
SRM Materials Cabbage Grove · Lamont
One-way
2.9 mi
Round trip
5.8 mi
TypeNameCityOne-wayRT mi
quarrySRM Materials Cabbage GroveLamont2.9 mi5.8
quarryPerry QuarryFort Myers19.8 mi39.5
quarryCYD Cabbage GroveDaytona Beach20.2 mi40.5
quarryBlue Rok Incorporatedperry27.8 mi55.5
quarrySwift Creek MineWhite Springs40.7 mi81.3
quarryDixie County PitCross City46.4 mi92.9
quarrySUWANNEE COUNTY PUBLIC WORKSLIVE OAK46.5 mi93
quarryBeachville MineLive Oak47.3 mi94.6
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Contractor
Anderson Columbia Co., Inc.
153 active projects · Jackson
📞 (386) 752-7585
People (7)
  • CINDY A CHILDERS · VP, D
  • DOUG · VP BOOTH
  • DOUGLAS M ANDERSON · VP, D
  • GENE STRICKLAND · VP, D
  • JOE H. ANDERSON III · P, D
  • TONY · VP WILLIAMS
  • +1 more

Permits & Sources

Every connector that's seen this project

EARLY SIGNALFDOT Work Program(FDOT Work Program)

State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.

Official source-of-truth portal
Taylor County Permits
Perry Building Department
ConnectorRecord IDCapturedLink
fdot_workprogramFDOTWP_445147152012026-03-08Open ↗

Parcel Detail

Property records and ownership

Property
County
Taylor
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

Award

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/fdot-bridge-replacement-sr55-us221-woods-creek-bridge-number-380009-taylor-co-ta-89a403e6