FDOT Bridge Replacement — SR 64 (MANATEE AVE)FROM SR 789 TO PERICO BAY BLVD (Manatee Co.)
SR 64 (MANATEE AVE)FROM SR 789 TO PERICO BAY BLVD, FL
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
The FDOT Bridge Replacement project on SR 64 in Manatee County involves roadway improvements that are crucial for local infrastructure and traffic flow. This project presents significant hauling opportunities for providers involved in earthwork, materials transport, and demolition as the construction progresses from its early pre-construction stage. Key contacts for this project include General Asphalt Company, LLC as the prime general contractor, and Halley Engineering Contractors, Inc. as a subcontractor; establishing connections with them now can facilitate future partnerships.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_40818535611 from fdot_workprogram
- 2026-03-27FDOT_LETTINGCaptured CO_T4674 from fdot_letting
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Caloosa Materials | Ruskin | 16.4 mi | 32.9 |
| quarry | Wingate Creek Mine | Lithia | 27.6 mi | 55.2 |
| quarry | Tampa Cement Grinding Plant | Tampa | 31.4 mi | 62.7 |
| quarry | South Pasture Mine | Lithia | 39.7 mi | 79.4 |
| quarry | Florida Shell & Fill Company LLC | Naples | 40.6 mi | 81.2 |
| quarry | Four Corners | Lithia | 41.3 mi | 82.5 |
| quarry | 4M-31 Mine | Alva | 48.0 mi | 96 |
| landfill | 63RD AVENUE EAST WASTE PROCESSING FACILITY | Bradenton | 4.9 mi | 9.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_40818535611 | 2026-03-08 | Open ↗ |
| fdot_letting | CO_T4674 | 2026-03-27 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Manatee
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-bridge-replacement-sr-64-manatee-ave-from-sr-789-to-perico-bay-blvd-manatee-9d89dbd6