FDOT Bridge Repair/Rehabilitation — US19/SR55 OVER PITHLACHASCOTEE RIVER BR#140005 SUB (Pasco Co.)
US19/SR55 OVER PITHLACHASCOTEE RIVER BR#140005 SUBSTRUCTURE REPAIR, Pasco County, FL
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
The FDOT Bridge Repair/Rehabilitation project on US19/SR55 over the Pithlachascotee River in Pasco County, FL, involves significant substructure repairs and is currently under construction. This public works project presents substantial hauling opportunities for transporting earthwork and materials essential for roadway improvements, making it critical for hauling providers to engage with active subcontractors and general contractors. Key contacts include V.A. Paving, Inc. (prime GC, 321-636-2565), D.A.B. Constructors, Inc. (prime GC, 352-447-5488), and several subcontractors such as OHLA USA Inc. (786-418-3740) and Preferred Materials Inc. (813-973-2888).
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_44383715201 from fdot_workprogram
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | West Florida Aggregate | Webster | 10.4 mi | 20.8 |
| quarry | Central State Aggregates LLC | Zephyrhill | 12.8 mi | 25.6 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 18.3 mi | 36.7 |
| quarry | Mid-Coast Aggregates LLC-Mazak Mine | Webster | 20.1 mi | 40.1 |
| quarry | Brooksville South Cement Plant | Brooksville | 21.1 mi | 42.2 |
| quarry | Brooksville Quarry | Brooksville | 21.6 mi | 43.2 |
| quarry | Center Hill Mine | Brooksville | 21.7 mi | 43.4 |
| sand pit | County Line Mine | Spring Hill | 23.6 mi | 47.3 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
- ARNOLD A JR · VTD MALLARD
- TERRI M · VSD HART
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_44383715201 | 2026-03-08 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-bridge-repair-rehabi-us19-sr55-over-pithlachascotee-river-br-140005-sub-pas-4430d061