FDOT Bridge Repair/Rehabilitation — SR5/US1 OVERSEAS HWY SEVEN MILE BRIDGE OVER MOSER (Monroe Co.)
SR5/US1 OVERSEAS HWY SEVEN MILE BRIDGE OVER MOSER CHANNEL- BR# 900101, Monroe County, FL
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
The FDOT Bridge Repair/Rehabilitation project at SR5/US1 Overseas Highway Seven Mile Bridge over Moser Channel in Monroe County, FL, involves critical roadway work that has recently been awarded and is set to commence in FY2026. This project presents significant hauling opportunities for providers, particularly in earthwork and materials transport, as the contract execution indicates immediate logistical needs. Key contact for potential hauling partnerships is Kiewit Infrastructure South Co., with their project management team available at (813) 337-5210.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_44623115201 from fdot_workprogram
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | SDI Aggregates LLC | Fort Myers | 23.6 mi | 47.3 |
| quarry | Krome Quarry | MIAMI | 41.7 mi | 83.3 |
| quarry | Epic Stoneworks, Inc. | Cutler Bay | 48.4 mi | 96.8 |
| quarry | Miami Cement Plant | Miami | 48.9 mi | 97.9 |
| transfer station | ATLANTIC TRASH AND TRANSFER | Key Largo | 2.5 mi | 5 |
| landfill | KEY LARGO TRANSFER STATION AND CLOSED LANDFILL | Key Largo | 14.0 mi | 28 |
| transfer station | WM RECYCLING HOMESTEAD MRF AND C&D FACILITY | Homestead | 27.4 mi | 54.9 |
| transfer station | LONG KEY TRANSFER STATION | Long Key | 28.5 mi | 57 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_44623115201 | 2026-03-08 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Monroe
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-bridge-repair-rehabi-sr5-us1-overseas-hwy-seven-mile-bridge-over-moser-monr-c6c0b366