Leads/fdot-bridge-repair-rehabi-sr-5-us-1-overseas-hwy-over-torch-key-channel-br-monro-189c7d76
Active · utilitiesMonroe County

FDOT Bridge Repair/Rehabilitation — SR 5/US-1 OVERSEAS HWY OVER TORCH KEY CHANNEL - BR (Monroe Co.)

SR 5/US-1 OVERSEAS HWY OVER TORCH KEY CHANNEL - BRIDGE # 900113, Monroe County, FL

Load estimate pending
Lifecycle
Filed as of Jan 1, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

FDOT Bridge Repair/Rehabilitation — SR 5/US-1 OVERSEAS HWY OVER TORCH KEY CHANNEL - BR (Monroe Co.)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
KIEWIT INFRASTRUCTURE SOUTH CO.
📞 (954) 835-2228
Developer / Applicant

Not yet identified

The story

The FDOT Bridge Repair/Rehabilitation project over Torch Key Channel in Monroe County, FL, is a crucial public works initiative focused on roadway infrastructure, currently in the review stage and slated for FY2027. This project presents significant hauling opportunities for providers due to its extensive earthwork, material transport, and potential demolition services. Key contact for this project is Kiewit Infrastructure South Co., with the project manager available at (813) 337-5210, making it an opportune time to build relationships ahead of construction.

Why this is a hauling opportunity: FDOT bridge-repair/rehabi project, status: pre-const.underway, in Monroe County, FY2027, — early stage, build relationships now | Connector base: 72 | FDOT/public project (+10) | Roadway/highway work (+10) | FDOT public project (+15) | government/public-authority project (floor 55) | FDOT public project (+15) | government/public-authority project (floor 55) | FDOT public project (+15) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-03-08FDOT_WORKPROGRAM
    Captured FDOTWP_44618415201 from fdot_workprogram

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
CUDJOE KEY LANDFILL · Cudjoe Key
One-way
7.6 mi
Round trip
15.3 mi
TypeNameCityOne-wayRT mi
landfillCUDJOE KEY LANDFILLCudjoe Key7.6 mi15.3
transfer stationNEW ROCKLAND RECYCLING CENTERKey West19.0 mi38
transfer stationCITY OF KEY WEST SOLID WASTE TRANSFER STATIONKey West19.0 mi38.1
transfer stationMARATHON TRANSFER STATIONMarathon22.2 mi44.3
transfer stationKEY WEST TRANSFER STATION AND HAULING SERVICE INCKey West22.9 mi45.7
transfer stationLONG KEY TRANSFER STATIONLong Key37.1 mi74.3
landfillMount Trashmore23.5 mi47

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Contractor
KIEWIT INFRASTRUCTURE SOUTH CO.
Civil
4 active projects · Monroe
📞 (954) 835-2228
People (6)
  • TIMOTHY J · SVP CLEARY
  • TIMOTHY J · SVP CLEARY
  • JAMES M NOLAN · CONTROLLER
  • JAMES M NOLAN · CONTROLLER
  • STEPHEN S · T THOMAS
  • STEPHEN S · T THOMAS

Permits & Sources

Every connector that's seen this project

EARLY SIGNALFDOT Work Program(FDOT Work Program)

State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.

Official source-of-truth portal
Monroe County Permits
Florida Keys Building Department
ConnectorRecord IDCapturedLink
fdot_workprogramFDOTWP_446184152012026-03-08Open ↗

Parcel Detail

Property records and ownership

Property
County
Monroe
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

Award

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/fdot-bridge-repair-rehabi-sr-5-us-1-overseas-hwy-over-torch-key-channel-br-monro-189c7d76