FDOT Bike Path/Trail — SR15(US17) @ MEMORIAL BRIDGE PEDESTRIAN PIERDECK R (Putnam Co.)
SR15(US17) @ MEMORIAL BRIDGE PEDESTRIAN PIERDECK REPLACEMENT & REHAB, Putnam County, FL
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_44542125801 from fdot_workprogram
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | SRM Materials East Palatka | Murfresboro | 6.7 mi | 13.3 |
| sand pit | Keuka Sand Plant | Jacksonville | 17.3 mi | 34.5 |
| sand pit | Grandin Sand Plant | Jacksonville | 18.5 mi | 36.9 |
| quarry | Edgar Minerals, Inc. | Davenport | 19.0 mi | 38 |
| sand pit | Goldhead Sand Plant | Jacksonville | 23.9 mi | 47.9 |
| quarry | The Chemours Company FC LLC | Starke | 33.2 mi | 66.5 |
| sand pit | Lynne Mine | Davenport | 34.6 mi | 69.1 |
| quarry | Reddick Mine | Pompano Beach | 38.8 mi | 77.6 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
- ★III P.O. BOX FRED J · CEO SMITH
- ★JAMES · VP STRAIN
- GREGORY A P.O. BOX · V HOFFMAN
- JAMES W PO BOX · V MORETZ
- MATTHEW · CFO STEELE
- MORGAN P.O. BOX · AS QUIRK
- +2 more
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_44542125801 | 2026-03-08 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Putnam
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-bike-path-trail-sr15-us17-memorial-bridge-pedestrian-pierdeck-r-putnam-co-p-8827122f