Leads/fdot-bike-lane-sidewalk-nw-1st-st-broward-co-broward-fl-575146f0
Active · utilitiesBroward County

FDOT Bike Lane/Sidewalk — NW 1ST ST (Broward Co.)

NW 1ST ST FROM BRYAN ROAD TO SR-5/US-1, Broward County, FL

Load estimate pending
Lifecycle
Filed as of Jan 1, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

FDOT Bike Lane/Sidewalk — NW 1ST ST (Broward Co.)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Weekley Asphalt Paving, Inc.
📞 (954) 680-8005
Developer / Applicant

Not yet identified

The story

This FDOT bike lane and sidewalk expansion project on NW 1st Street in Broward County is a pre-construction roadway improvement with solid hauling demand for site prep, asphalt millings, and aggregate material delivery. With a 70/100 hauling score and early project stage, now is the ideal time to establish relationships before full construction mobilization in FY2026. Contact Weekley Asphalt Paving, Inc. (954-680-8005) as the prime GC to discuss earthwork, demolition, and material hauling opportunities.

Why this is a hauling opportunity: FDOT bike lane/sidewalk project, status: pre-const.underway, in Broward County, FY2026, — early stage, build relationships now | Connector base: 50 | FDOT/public project (+10) | Roadway/highway work (+10) | FDOT public project (+15) | government/public-authority project (floor 55) | FDOT public project (+15) | government/public-authority project (floor 55) | FDOT public project (+15) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-03-08FDOT_WORKPROGRAM
    Captured FDOTWP_44394915801 from fdot_workprogram

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
WHITE ROCK QUARRIES · West Palm Beach
One-way
20.3 mi
Round trip
40.6 mi
TypeNameCityOne-wayRT mi
quarryWHITE ROCK QUARRIESWest Palm Beach20.3 mi40.6
quarryFEC QUARRYMIAMI21.6 mi43.1
quarryPENNSUCO CEMENT PLANTMedley21.9 mi43.8
quarryPENNSUCO QUARRYMedley21.9 mi43.8
quarryEpic Stoneworks, Inc.Cutler Bay26.7 mi53.4
quarryMiami QuarryJacksonville27.0 mi53.9
quarryMiami Cement PlantMiami28.9 mi57.7
quarryKrome QuarryMIAMI36.8 mi73.6
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Contractor
Weekley Asphalt Paving, Inc.
Paving
64 active projects · Broward
📞 (954) 680-8005
People (2)
  • DANIEL D · P WEEKLEY
  • WAYNE D · ST WEEKLEY

Permits & Sources

Every connector that's seen this project

EARLY SIGNALFDOT Work Program(FDOT Work Program)

State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.

Official source-of-truth portal
Broward County Permits
Fort Lauderdale area Building Division
ConnectorRecord IDCapturedLink
fdot_workprogramFDOTWP_443949158012026-03-08Open ↗

Parcel Detail

Property records and ownership

Property
County
Broward
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

Award

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/fdot-bike-lane-sidewalk-nw-1st-st-broward-co-broward-fl-575146f0