FDOT Add Left Turn Lane(S — SR 789 (GULF OF MEXICO DR) (Sarasota Co.)
SR 789 (GULF OF MEXICO DR) FROM CHANNEL PL TO LONGBOAT CLUB RD, Sarasota County, FL
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
The FDOT is initiating a public works project to add a left turn lane along SR 789 (Gulf of Mexico Dr) in Sarasota County, FL. This project is critical for hauling providers as it will involve substantial earthwork and material transport for roadway expansion, presenting a timely and significant opportunity for engagement. Key contacts for coordination include SEMA Construction, Inc. at (303) 627-2600, which serves as the prime general contractor, and their subcontractors, Vecellio & Grogan, Inc. at (561) 793-2102.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_44681515801 from fdot_workprogram
- 2026-04-24FDOT_LETTINGCaptured CO_T1920 from fdot_letting
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Caloosa Materials | Ruskin | 26.9 mi | 53.7 |
| quarry | Wingate Creek Mine | Lithia | 29.3 mi | 58.6 |
| quarry | Florida Shell & Fill Company LLC | Naples | 29.6 mi | 59.2 |
| quarry | Tampa Cement Grinding Plant | Tampa | 42.5 mi | 85.1 |
| quarry | South Pasture Mine | Lithia | 43.5 mi | 87 |
| quarry | 4M-31 Mine | Alva | 43.8 mi | 87.5 |
| sand pit | Washington Loop Mine | Punta Gorda | 45.1 mi | 90.3 |
| quarry | Bermont Materials Alico | Punta Gorda | 46.9 mi | 93.7 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_44681515801 | 2026-03-08 | Open ↗ |
| fdot_letting | CO_T1920 | 2026-04-24 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Sarasota
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-add-left-turn-lane-s-sr-789-gulf-of-mexico-dr-sarasota-co-sarasota-fl-038ac570