FDOT — (US 1 / N ROOSEVELT BLVD) FROM N OF EISENHOWER DR TO...
ALT US 19/SR 595 FROM S OF CURLEW PL TO N OFCOUNTRY CLUB CT, Pinellas County, FL
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
The FDOT roadway project at US 1/N Roosevelt Blvd in Pinellas County, FL, involves critical improvements for public infrastructure and is currently under construction, indicating significant earthwork and material hauling opportunities. With a high hauling score of 85/100, this project offers substantial demand for trucking services in transporting asphalt, aggregates, and supporting materials. Key contacts include C.W. Roberts Contracting, Inc. (Prime GC) at (813) 756-2009 and General Asphalt Company, LLC (Prime GC) at (305) 592-3480, both of whom represent pivotal points of access for hauling providers to engage in this lucrative project.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_43771015699 from fdot_workprogram
- 2026-03-23FDOT_LETTINGCaptured CO_T6603 from fdot_letting
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Caloosa Materials | Ruskin | 13.0 mi | 26 |
| quarry | Tampa Cement Grinding Plant | Tampa | 16.1 mi | 32.2 |
| quarry | Central State Aggregates LLC | Zephyrhill | 36.1 mi | 72.1 |
| quarry | Wingate Creek Mine | Lithia | 36.7 mi | 73.5 |
| quarry | Four Corners | Lithia | 40.6 mi | 81.3 |
| quarry | South Pasture Mine | Lithia | 43.0 mi | 86.1 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 43.0 mi | 86 |
| sand pit | County Line Mine | Spring Hill | 45.5 mi | 90.9 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
- ★III P.O. BOX FRED J · CEO SMITH
- ★JAMES · VP STRAIN
- GREGORY A P.O. BOX · V HOFFMAN
- JAMES W PO BOX · V MORETZ
- MATTHEW · CFO STEELE
- MORGAN P.O. BOX · AS QUIRK
- +2 more
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_43771015699 | 2026-03-08 | Open ↗ |
| fdot_letting | CO_T6603 | 2026-03-23 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pinellas
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-add-left-turn-lane-s-alt-us-19-sr-595-pinellas-co-pinellas-fl-714ed0af