Leads/fdot-add-lanes-rehabili-sr-50-orange-co-orange-fl-8e5443d3
Approved · mobilizationOrange County

FDOT — AND SR 5 (US 1) FROM E OF I-95 TO US 1 AND FROM S OF

SR 50 FROM AVALON PARK BLVD TO EAST OF ECON RIVER BRIDGE, Orange County, FL

Load estimate pending
Lifecycle
Permitted as of Feb 18, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

FDOT — AND SR 5 (US 1) FROM E OF I-95 TO US 1 AND FROM S OF

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$10.9M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor
De Moya Contracting LLC
📞 (305) 255-5713
Developer / Applicant
Florida Department of Transportation
Why this is a hauling opportunity: FDOT awarded contract on AND SR 5 (US 1) FROM E OF I-95 TO US 1 AND FROM S OF ($10,949,338) | Connector base: 85 | FDOT/public project (+10) | Roadway/highway work (+10) | Keyword match: 1 categories (+5) | Size multiplier x1.3 (valuation $10,949,338) | Stage = awarded_public — actionable now (+10) | FDOT public project (+15) | size signal: $10,949,338 valuation (+20) | stage=awarded_public, recent (+10) | government/public-authority project (floor 55) | FDOT public project (+15) | size signal: $10,949,338 valuation (+20) | stage=awarded_public, recent (+10) | government/public-authority project (floor 55) | FDOT public project (+15) | size signal: $10,949,338 valuation (+20) | stage=awarded_public, recent (+10) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-03-08FDOT_WORKPROGRAM
    Captured FDOTWP_23920385201 from fdot_workprogram
  2. 2026-03-08FDOT_WORKPROGRAM
    Captured FDOTWP_45609615201 from fdot_workprogram
  3. 2026-03-08FDOT_WORKPROGRAM
    Captured FDOTWP_45609625201 from fdot_workprogram

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
Center Sand Company · Clermont
One-way
18.9 mi
Round trip
37.8 mi
TypeNameCityOne-wayRT mi
sand pitCenter Sand CompanyClermont18.9 mi37.8
sand pitIndependent MineDavenport19.6 mi39.2
sand pitFour Corners Sand MineBrooksville19.8 mi39.6
quarryS & L Materials IncKISSIMMEE22.4 mi44.7
sand pitHilochee Sand MineDavenport22.8 mi45.7
quarryBeeline MineOrlando23.4 mi46.8
sand pitCypress SandLexington23.9 mi47.9
sand pitAstatula Sand PlantJacksonville24.2 mi48.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
Florida Department of Transportation
Contractor
De Moya Contracting LLC
8 active projects · Hillsborough
📞 (305) 255-5713
Subcontractor
De Moya Contracting LLC
8 active projects · Hillsborough
📞 (305) 255-5713

Permits & Sources

Every connector that's seen this project

EARLY SIGNALFDOT Work Program(FDOT Work Program)

State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.

Official source-of-truth portal
Orange County Permits
Orlando area building permit search
ConnectorRecord IDCapturedLink
fdot_workprogramFDOTWP_239203852012026-03-08Open ↗
fdot_workprogramFDOTWP_456096152012026-03-08Open ↗
fdot_workprogramFDOTWP_456096252012026-03-08Open ↗

Parcel Detail

Property records and ownership

Property
County
Orange
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

Award

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/fdot-add-lanes-rehabili-sr-50-orange-co-orange-fl-8e5443d3