Approved · unknownHILLSBOROUGH County
Cleanup (petroleum cleanup) — TEXACO #202-24-204-1340
1021 W SWANN AVE, TAMPA, FL, 33606
~8loads
fill dirt + base rock
≤1 wk
Lifecycle
Active as of Jun 9, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — TEXACO #202-24-204-1340
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
0.034 ac
Parcel 1850430000
Est truck loads
—
Needs site plan parse
Sources seen
10
Public records referencing this job
General Contractor
Not yet identified
Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-06-10FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87922695 from fdep_cleanup_sites
- 2026-06-11HCPACaptured HCPA_1850430000_fb509382 from hcpa
- 2026-06-11FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87943132 from fdep_cleanup_sites
- 2026-06-15FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87983997 from fdep_cleanup_sites
- 2026-06-19HCPACaptured HCPA_1850430000_fd323539 from hcpa
- 2026-06-21HCPACaptured HCPA_1850430000_7baa9bf3 from hcpa
- 2026-06-25FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88086041 from fdep_cleanup_sites
- 2026-06-26HCPACaptured HCPA_1850430000_a2e59cc2 from hcpa
- 2026-06-28FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88106436 from fdep_cleanup_sites
- 2026-06-29HCPACaptured HCPA_1850430000_c0d12d0f from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
1.7 mi
Round trip
3.5 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 1.7 mi | 3.5 |
| quarry | Caloosa Materials | Ruskin | 16.3 mi | 32.6 |
| quarry | Central State Aggregates LLC | Zephyrhill | 21.3 mi | 42.6 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 31.0 mi | 62 |
| quarry | Four Corners | Lithia | 32.8 mi | 65.6 |
| sand pit | County Line Mine | Spring Hill | 34.7 mi | 69.4 |
| quarry | Wingate Creek Mine | Lithia | 37.0 mi | 74 |
| quarry | South Pasture Mine | Lithia | 37.8 mi | 75.6 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Official source-of-truth portal
Hillsborough County Permits ↗Tampa area permits, inspections, reviews
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87922695 | 2026-06-10 | Open ↗ |
| hcpa | HCPA_1850430000_fb509382 | 2026-06-11 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87943132 | 2026-06-11 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87983997 | 2026-06-15 | Open ↗ |
| hcpa | HCPA_1850430000_fd323539 | 2026-06-19 | Open ↗ |
| hcpa | HCPA_1850430000_7baa9bf3 | 2026-06-21 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88086041 | 2026-06-25 | Open ↗ |
| hcpa | HCPA_1850430000_a2e59cc2 | 2026-06-26 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88106436 | 2026-06-28 | Open ↗ |
| hcpa | HCPA_1850430000_c0d12d0f | 2026-06-29 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
PropertyHCPA ↗
- Folio
- 1850430000
- Strap
- A-23-29-18-4SW-E00000-00002.1
- Address
- 1021 W SWANN AVE, TAMPA
- Zip
- 33606
- Acreage
- 0.034 ac
- Sq ft
- 1,460
- Homestead
- NO
Owner of record
BIEN BROS INVESTMENT LLC
Last sale
2021-12-22
$1,950,000
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/fb509382