Leads/fa26408f
Approved · planningSarasota County

EO - Hampton Lakes East

SWFWMD ERP — site address pending

Load estimate pending
Lifecycle
Permitted as of Feb 18, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

EO - Hampton Lakes East

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 2/18/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
Medallion Homes
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-17SWFWMD_ERP
    Captured SWFWMD_ERP_929003 from swfwmd_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Wingate Creek Mine · Lithia
One-way
13.8 mi
Round trip
27.6 mi
TypeNameCityOne-wayRT mi
quarryWingate Creek MineLithia13.8 mi27.6
quarryCaloosa MaterialsRuskin26.5 mi53
quarry4M-31 MineAlva27.1 mi54.1
quarryFlorida Shell & Fill Company LLCNaples28.4 mi56.7
quarrySouth Pasture MineLithia28.6 mi57.2
sand pitWashington Loop MinePunta Gorda33.0 mi66
quarryFour CornersLithia34.1 mi68.2
quarryBermont Materials AlicoPunta Gorda34.8 mi69.7
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
Medallion Homes
People (4)
  • IRVING BERGER · PD
  • LOUIS · D FINK
  • LOUIS FINK · ST
  • MERVIN WIDEMAN · VD

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (Petition for Formal Determination))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

Official source-of-truth portal
Sarasota County Permits
Sarasota / Venice building permit search
ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_9290032026-05-17Open ↗

Parcel Detail

Property records and ownership

Property
County
Sarasota
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/fa26408f