Leads/f948d836
Approved · application_filed

MANATEE SWWRF MINOR MOD

4410 66TH STREET WEST, BRADENTON, FL, 34210

Load estimate pending
Lifecycle
Filed as of Apr 2, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

MANATEE SWWRF MINOR MOD

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 4/2/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
BAILEY PEAK
Why this is a hauling opportunity: Base unknown/other (20) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0071005-002 from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
5.3 mi
Round trip
10.6 mi
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
20.6 mi
Round trip
41.1 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin20.6 mi41.1
quarryWingate Creek MineLithia30.9 mi61.7
quarryTampa Cement Grinding PlantTampa35.1 mi70.1
quarryFlorida Shell & Fill Company LLCNaples39.1 mi78.2
quarrySouth Pasture MineLithia43.5 mi87
quarryFour CornersLithia45.4 mi90.7
landfill63RD AVENUE EAST WASTE PROCESSING FACILITYBradenton5.3 mi10.6
landfillRECOMMUNITY HOLDINGS LP (FKA RRS/FCR)Sarasota7.9 mi15.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - ERP Modifications))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0071005-0022026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/f948d836