Approved · unknownHILLSBOROUGH County
Cleanup (petroleum cleanup) — MOBIL #02-CVB
7620 W HILLSBOROUGH AVE, TAMPA, FL, 33615
~28loads
fill dirt + base rock
≤1 wk
Lifecycle
Active as of May 28, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — MOBIL #02-CVB
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
0.11 ac
Parcel 0099480000
Est truck loads
—
Needs site plan parse
Sources seen
8
Public records referencing this job
General Contractor
Not yet identified
Why this is a hauling opportunity: Base site_development/earthwork (65) | size signal: ~28 est. loads (+6) | stage=under_construction, recent (+10) | individual owner, residential scale — capped low
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87799939 from fdep_cleanup_sites
- 2026-06-10FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87922612 from fdep_cleanup_sites
- 2026-06-11HCPACaptured HCPA_0099480000_f694cc49 from hcpa
- 2026-06-11HCPACaptured HCPA_0099480000_e4bfaf79 from hcpa
- 2026-06-11FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87943049 from fdep_cleanup_sites
- 2026-06-12HCPACaptured HCPA_0099480000_b970c8d4 from hcpa
- 2026-06-15FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87983914 from fdep_cleanup_sites
- 2026-06-19HCPACaptured HCPA_0099480000_e3768ea7 from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
8.7 mi
Round trip
17.3 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 8.7 mi | 17.3 |
| quarry | Caloosa Materials | Ruskin | 21.7 mi | 43.3 |
| quarry | Central State Aggregates LLC | Zephyrhill | 21.9 mi | 43.8 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 27.4 mi | 54.7 |
| sand pit | County Line Mine | Spring Hill | 30.1 mi | 60.3 |
| quarry | Four Corners | Lithia | 39.8 mi | 79.6 |
| quarry | Brooksville Quarry | Brooksville | 41.3 mi | 82.5 |
| quarry | Brooksville South Cement Plant | Brooksville | 41.7 mi | 83.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Official source-of-truth portal
Hillsborough County Permits ↗Tampa area permits, inspections, reviews
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87799939 | 2026-05-28 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87922612 | 2026-06-10 | Open ↗ |
| hcpa | HCPA_0099480000_f694cc49 | 2026-06-11 | Open ↗ |
| hcpa | HCPA_0099480000_e4bfaf79 | 2026-06-11 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87943049 | 2026-06-11 | Open ↗ |
| hcpa | HCPA_0099480000_b970c8d4 | 2026-06-12 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87983914 | 2026-06-15 | Open ↗ |
| hcpa | HCPA_0099480000_e3768ea7 | 2026-06-19 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
PropertyHCPA ↗
- Folio
- 0099480000
- Strap
- U-01-29-17-0EF-000000-00045.8
- Address
- 7620 W HILLSBOROUGH AVE, TAMPA
- Zip
- 33615
- Acreage
- 0.11 ac
- Sq ft
- 4,797
- Homestead
- NO
Owner of record
MELANSON GREGORY R TRUSTEE
Last sale
2019-10-29
$2,068,200
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/f694cc49