Approved · unknown
FDOT — ITS REPLACEMENTS FOR BEACHLINE EAST (SR528),ORANGE & BREVARD ,MP31-45.7 - ITS COMMUNICATION SYSTEM
FL County — FDOT Contract E8U70
Load estimate pending
Lifecycle
Active as of Oct 7, 2024
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
FDOT — ITS REPLACEMENTS FOR BEACHLINE EAST (SR528),ORANGE & BREVARD ,MP31-45.7 - ITS COMMUNICATION SYSTEM
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$19.6M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT utilities contract — ITS REPLACEMENTS FOR BEACHLINE EAST (SR528),ORANGE & BREVARD ,MP31-45.7 - ITS CO. Vendor: TRAFFIC MANAGEMENT SOLUTIONS, LLC. Cost: $19,634,427. | FDOT public project (+15) | size signal: $19,634,427 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $19,634,427 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $19,634,427 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $19,634,427 valuation (+20) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_E8U70_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Beeline Mine · Orlando
One-way
5.7 mi
Round trip
11.3 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Beeline Mine | Orlando | 5.7 mi | 11.3 |
| quarry | S & L Materials Inc | KISSIMMEE | 5.9 mi | 11.9 |
| quarry | Rock Solid Rock, LLC | Titusville | 6.4 mi | 12.8 |
| quarry | Buck Hammock | Orlando | 25.0 mi | 50 |
| quarry | FLINT PLANT | Davenport | 44.0 mi | 87.9 |
| sand pit | Davenport Sand Mine | Brooksville | 44.4 mi | 88.7 |
| sand pit | SILICA PLANT | Davenport | 44.6 mi | 89.2 |
| quarry | Brisbane Pit | Fellsmere | 45.6 mi | 91.2 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_E8U70_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/f6564106