Leads/f5e9515d
Approved · unknownHILLSBOROUGH County

Cleanup (petroleum cleanup) — UNITED 500 #505

6909 SHELDON RD, TAMPA, FL, 33615

~15loads
fill dirt + base rock
≤1 wk
Lifecycle
Active as of Jun 9, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

Cleanup (petroleum cleanup) — UNITED 500 #505

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
0.06 ac
Parcel 0046780000
Est truck loads
Needs site plan parse
Sources seen
4
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
SHEHAB HISHAM
Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=under_construction, recent (+10) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-06-10FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_87922530 from fdep_cleanup_sites
  2. 2026-06-11HCPA
    Captured HCPA_0046780000_f5e9515d from hcpa
  3. 2026-06-25FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_88085876 from fdep_cleanup_sites
  4. 2026-06-26HCPA
    Captured HCPA_0046780000_4cd5f251 from hcpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
10.1 mi
Round trip
20.2 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa10.1 mi20.2
quarryCentral State Aggregates LLCZephyrhill22.0 mi44
quarryCaloosa MaterialsRuskin23.1 mi46.2
quarryGeorgia Stone Spring Hill QuarryAtlanta 26.5 mi52.9
sand pitCounty Line MineSpring Hill29.0 mi58.1
quarryBrooksville QuarryBrooksville40.3 mi80.7
quarryBrooksville South Cement PlantBrooksville40.8 mi81.6
quarryFour CornersLithia41.2 mi82.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
SHEHAB HISHAM

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
fdep_cleanup_sitesFDEP_CLEANUP_879225302026-06-10Open ↗
hcpaHCPA_0046780000_f5e9515d2026-06-11Open ↗
fdep_cleanup_sitesFDEP_CLEANUP_880858762026-06-25Open ↗
hcpaHCPA_0046780000_4cd5f2512026-06-26Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
0046780000
Strap
U-26-28-17-ZZZ-000000-38460.0
Address
6909 SHELDON RD, TAMPA
Zip
33615
Acreage
0.06 ac
Sq ft
2,634
Homestead
NO
Owner of record
SHEHAB HISHAM
CHEHAB TAREK
Last sale
2005-12-16
$350,000

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/f5e9515d