Leads/f4f586a1
Approved · application_filed

COX DREDGE

836 65TH ST NW, BRADENTON, FL, 34209

Load estimate pending
Lifecycle
Filed as of Mar 31, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

COX DREDGE

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 3/31/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
KRISTOPHER COX
Why this is a hauling opportunity: Base unknown/other (20) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0470347-001 from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
7.4 mi
Round trip
14.8 mi
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
17.7 mi
Round trip
35.4 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin17.7 mi35.4
quarryWingate Creek MineLithia30.8 mi61.7
quarryTampa Cement Grinding PlantTampa31.7 mi63.3
quarrySouth Pasture MineLithia42.7 mi85.3
quarryFlorida Shell & Fill Company LLCNaples42.5 mi85
quarryFour CornersLithia43.9 mi87.7
landfill63RD AVENUE EAST WASTE PROCESSING FACILITYBradenton7.4 mi14.8
landfillRECOMMUNITY HOLDINGS LP (FKA RRS/FCR)Sarasota10.8 mi21.6
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
KRISTOPHER COX

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - Individual With No Conceptual Approval Permit))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0470347-0012026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/f4f586a1