Approved · unknownPINELLAS County
Cleanup (petroleum cleanup) — BARNETT BANK/WALGREEN
1604 S MISSOURI AVE, CLEARWATER, FL, 34616
~566loads
fill dirt + base rock
4 wk
Lifecycle
Active as of May 28, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — BARNETT BANK/WALGREEN
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
2.2624 ac
Parcel 346202
Est truck loads
—
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor
Not yet identified
Why this is a hauling opportunity: Base site_development/earthwork (65) | size signal: 2.3 ac disturbed, ~566 est. loads (+20) | stage=under_construction, recent (+10) | government/public-authority project (floor 55)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87800062 from fdep_cleanup_sites
- 2026-06-09PCPAOCaptured PCPAO_346202_f3e539d1 from pcpao
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (landfill)
ANGELO'S RECYCLED MATERIALS - LARGO MRF · Largo
One-way
2.9 mi
Round trip
5.8 mi
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
21.1 mi
Round trip
42.3 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 21.1 mi | 42.3 |
| quarry | Caloosa Materials | Ruskin | 26.8 mi | 53.6 |
| quarry | Central State Aggregates LLC | Zephyrhill | 35.2 mi | 70.4 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 35.9 mi | 71.8 |
| sand pit | County Line Mine | Spring Hill | 36.6 mi | 73.2 |
| quarry | Brooksville Quarry | Brooksville | 49.2 mi | 98.5 |
| landfill | ANGELO'S RECYCLED MATERIALS - LARGO MRF | Largo | 2.9 mi | 5.8 |
| transfer station | CITY OF CLEARWATER TRANSFER STATION | Clearwater | 4.3 mi | 8.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87800062 | 2026-05-28 | Open ↗ |
| pcpao | PCPAO_346202_f3e539d1 | 2026-06-09 | Open ↗ |
Parcel Detail
Pinellas County Property Appraiser
PropertyPCPAO ↗
- Folio
- 346202
- Strap
- 27-29-15-07204-000-0020
- Address
- 1604 S Missouri Ave
- Zip
- 33756
- Acreage
- 2.2624 ac
- Sq ft
- 98,550
- Year built
- 1996
- Use
- 1120 Single Buildin ...
- Subdivision
- BELLEGREEN PLACE
Owner of record
FALLS CITY TABACCO CO INC
Last sale
1998-10-01
$3,040,000
Appraiser valuation
- Just (market)
- $3,415,000
- Assessed
- $3,415,000
- Taxable
- $3,415,000
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/f3e539d1