Dune Beach Structure — Nourishment (Sarasota County)
Midnight Pass
- Filed
- Permitted
- Active
- Completed
Paperwork in — not yet approved
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 4/12/1988 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_COASTAL_ENVCaptured FDEP_COASTAL_ENV_-DBS880216 from fdep_coastal_env
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Florida Shell & Fill Company LLC | Naples | 21.2 mi | 42.3 |
| quarry | Wingate Creek Mine | Lithia | 31.0 mi | 62 |
| quarry | Caloosa Materials | Ruskin | 34.1 mi | 68.2 |
| sand pit | Washington Loop Mine | Punta Gorda | 38.6 mi | 77.3 |
| quarry | 4M-31 Mine | Alva | 40.1 mi | 80.1 |
| quarry | Bermont Materials Alico | Punta Gorda | 40.3 mi | 80.5 |
| quarry | South Pasture Mine | Lithia | 45.8 mi | 91.6 |
| sand pit | Watermelon Pit | Punta Gorda | 48.4 mi | 96.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_coastal_env | FDEP_COASTAL_ENV_-DBS880216 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/f14af291