ERIE CONSTRUCTION MID WEST LLC project — 28-26-16
28-26-16
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Erie Construction Midwest LLC has secured permits for a site development earthwork project at 28-26-16, representing a solid hauling opportunity with a 75/100 score. The project involves significant excavation and grading work that will require material hauling, spoil removal, and site preparation—ideal for dump truck and material transport services. Contact prime GC Erie Construction Midwest LLC directly, with owner-developer David A. Jenkins as a secondary stakeholder, as the permit stage indicates active mobilization and imminent material movement.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-22PASCO_NOCCaptured Pasco_2026079519 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | County Line Mine | Spring Hill | 18.5 mi | 36.9 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 18.8 mi | 37.5 |
| quarry | Tampa Cement Grinding Plant | Tampa | 24.1 mi | 48.2 |
| quarry | Central State Aggregates LLC | Zephyrhill | 25.1 mi | 50.2 |
| quarry | Brooksville Quarry | Brooksville | 31.3 mi | 62.6 |
| quarry | Brooksville South Cement Plant | Brooksville | 32.0 mi | 64.1 |
| quarry | Calcium Plant | Jacksonville | 34.9 mi | 69.8 |
| quarry | Caloosa Materials | Ruskin | 37.7 mi | 75.3 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026079519 | 2026-05-22 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/erie-construction-mid-west-llc-project-28-26-16-pasco-fl-521a3973