Leads/erie-construction-mid-west-llc-project-08-25-17-pasco-fl-98ce4d67
Approved · unknownPasco County

ERIE CONSTRUCTION MID WEST LLC project — 08-25-17

08-25-17

Load estimate pending
Lifecycle
Permitted as of Mar 27, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

ERIE CONSTRUCTION MID WEST LLC project — 08-25-17

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
ERIE CONSTRUCTION MID WEST LLC
Developer / Applicant
JONES RICHARD
The story

Erie Construction Mid West LLC's site development project in the permit-issued stage represents a significant earthwork opportunity with a 75/100 hauling score, indicating imminent material movement and soil export needs. As the primary general contractor, Erie Construction Mid West LLC will likely require debris removal, cut/fill material hauling, and site prep services during mobilization. Contact Richard Jones (owner/developer) and Erie Construction Mid West LLC directly to secure earthwork and material transport contracts before active site work begins.

Why this is a hauling opportunity: General contractor NOC: ERIE CONSTRUCTION MID WEST LLC | Connector base: 65 | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-22PASCO_NOC
    Captured Pasco_2026056859 from pasco_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
8.3 mi
Round trip
16.6 mi
TypeNameCityOne-wayRT mi
sand pitCounty Line MineSpring Hill8.3 mi16.6
quarryGeorgia Stone Spring Hill QuarryAtlanta 9.3 mi18.7
quarryBrooksville QuarryBrooksville21.1 mi42.2
quarryCentral State Aggregates LLCZephyrhill21.7 mi43.4
quarryBrooksville South Cement PlantBrooksville21.9 mi43.7
quarryCalcium PlantJacksonville24.7 mi49.4
quarryCenter Hill MineBrooksville28.3 mi56.6
quarryTampa Cement Grinding PlantTampa29.0 mi58
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
JONES RICHARD
Contractor
ERIE CONSTRUCTION MID WEST LLC
2 active projects · Pasco

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20260568592026-05-22Open ↗

Parcel Detail

Property records and ownership

Property
County
Pasco
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/erie-construction-mid-west-llc-project-08-25-17-pasco-fl-98ce4d67