ERIE CONSTRUCTION MID WEST LLC project — 08-25-17
08-25-17
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Erie Construction Mid West LLC's site development project in the permit-issued stage represents a significant earthwork opportunity with a 75/100 hauling score, indicating imminent material movement and soil export needs. As the primary general contractor, Erie Construction Mid West LLC will likely require debris removal, cut/fill material hauling, and site prep services during mobilization. Contact Richard Jones (owner/developer) and Erie Construction Mid West LLC directly to secure earthwork and material transport contracts before active site work begins.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-22PASCO_NOCCaptured Pasco_2026056859 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | County Line Mine | Spring Hill | 8.3 mi | 16.6 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 9.3 mi | 18.7 |
| quarry | Brooksville Quarry | Brooksville | 21.1 mi | 42.2 |
| quarry | Central State Aggregates LLC | Zephyrhill | 21.7 mi | 43.4 |
| quarry | Brooksville South Cement Plant | Brooksville | 21.9 mi | 43.7 |
| quarry | Calcium Plant | Jacksonville | 24.7 mi | 49.4 |
| quarry | Center Hill Mine | Brooksville | 28.3 mi | 56.6 |
| quarry | Tampa Cement Grinding Plant | Tampa | 29.0 mi | 58 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026056859 | 2026-05-22 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log