Leads/electrical-install-equal-panel-changeout-1601-hughes-drive-hillsborough-fl-580f88ce
Approved · unknownHillsborough County

Electrical Install Equal Panel Changeout — 1601 Hughes Drive

1601 Hughes Drive, Plant City, FL, 33563

Load estimate pending
Lifecycle
Permitted as of Feb 24, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Electrical Install Equal Panel Changeout — 1601 Hughes Drive

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Parcel 204396-1056
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Three Guys A/C & Electric
Developer / Applicant
Leon Moss
Why this is a hauling opportunity: Low hauling relevance: Electrical Install Equal Panel Changeout | stage=permit_issued, recent (+10) | single-trade residential permit — capped low | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-07-02OFFICIAL_RECORDS_NOC
    Captured Hillsborough_2026070993 from official_records_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Central State Aggregates LLC · Zephyrhill
One-way
17.5 mi
Round trip
35.1 mi
TypeNameCityOne-wayRT mi
quarryCentral State Aggregates LLCZephyrhill17.5 mi35.1
quarryFour CornersLithia18.8 mi37.6
quarryTampa Cement Grinding PlantTampa19.9 mi39.8
quarrySouth Pasture MineLithia26.7 mi53.5
quarryCaloosa MaterialsRuskin28.1 mi56.3
sand pitGator Sand MineBrooksville32.4 mi64.8
sand pitGreen Bay MineDavenport32.9 mi65.8
quarrySouth Fort Meade MineLithia33.1 mi66.2
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Contractor
Three Guys A/C & Electric

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
official_records_nocHillsborough_20260709932026-07-02Open ↗

Parcel Detail

Property records and ownership

Property
Parcel ID
204396-1056
County
Hillsborough
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/electrical-install-equal-panel-changeout-1601-hughes-drive-hillsborough-fl-580f88ce